Meadows Addn 6-CS 891215The City With A Beautiful Future
Paul S. Unzicker
Consulting Engineers
8700 Stemmons Freeway, Suite 400
Dallas, Texas 75247
RE: Meadows Section Six- Phase One
Inlet modification / Field Change
Dear Mr. Unzicker:
As we discussed, transmitted herewith is a copy of yo
the modified inlets (3) approved (as indicated). PI,
these details are placed on the plan~profile sheet.
builts and not on the Standard Details Sheets.
Depending upon the construction sequencing, we ~
especially observe and monitor these inlets sin
nonstandard.
You indicated you will do likewise and we will
evaluate these inlets during the standard inspectic
accepting this development for the City of Coppell.
If there are any questions, please contact either L,
myself. Thank you.
..:;./' 7
(.~/~ity Engineer~
RRD/bb
xc: Steve Goram, Director of Public Works
Larry Davis, Construction Inspector
MEADOWS6-1.RRD
P.O. Box 478
Coppell, Texas 75019
214-462-0022
ur design for
9ase see that
~ in the As-
· ill need to
ce they are
more closely
,n process in
~rry Davis or