Loading...
Meadows Addn 6-CS 891214 (2)December 14, 1989 PAUL S. UNZICKER, INC. CONSULTING ENGINEERS 8700 STEIgMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247' (214) 634'3300 Ms. Shohre Daneshmand, P.E. City of Coppell Department of Public Works P.O. Box 478 Coppell, Texas 75019 Re: Meadows Section six - Phase One Coppell, Texas 86062-0 Dear Shohre: Per your request, please find below a summary of the Improvement Inspection Fees due for the referenced fees are based on one and one half percent of the co for construction work which was within easements or Way. I have also included a copy of the actual contr~ can be found in the contracts for each contractor. were given to your office prior to construction. Th. follows: ~ion Cost Grading & Excavation Utilities (Water, Sewer, Drainage) Paving $ 10,800.00 231,720.07 242,558.20 TOTAL FEE A portion of these fees should be paid for by the City between D.T. Construction and City of Coppell for work Boulevard. If you have any questions, please feel fre, Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bp cc: Gordon Jones / D.T. Construction Russell Doyle, P.E. / City of Coppell ~/ Larry Davis, P.E. / City of Coppell PAUL S. UNZICKER, P.E. President DA~ ~stimated Public ~roject. These ~tract documents [blic Rights-of- Lctors bid which There contracts ~se fees are as Fee x 1.5% $ 162.00 3,475.80 3,638.37 $7,276.17 per agreement within Samuel to call. D M. SCHNURBUSCH, P.E. Vice President