Meadows Addn 6-CS 891214 (2)December 14, 1989
PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
8700 STEIgMONS FREEWAY, SUITE 400
DALLAS, TEXAS 75247'
(214) 634'3300
Ms. Shohre Daneshmand, P.E.
City of Coppell
Department of Public Works
P.O. Box 478
Coppell, Texas 75019
Re:
Meadows Section six - Phase One
Coppell, Texas
86062-0
Dear Shohre:
Per your request, please find below a summary of the
Improvement Inspection Fees due for the referenced
fees are based on one and one half percent of the co
for construction work which was within easements or
Way. I have also included a copy of the actual contr~
can be found in the contracts for each contractor.
were given to your office prior to construction. Th.
follows:
~ion Cost
Grading & Excavation
Utilities (Water, Sewer, Drainage)
Paving
$ 10,800.00
231,720.07
242,558.20
TOTAL FEE
A portion of these fees should be paid for by the City
between D.T. Construction and City of Coppell for work
Boulevard. If you have any questions, please feel fre,
Sincerely,
Kevin R. Kendrick, P.E.
Project Manager
KRK/bp
cc: Gordon Jones / D.T. Construction
Russell Doyle, P.E. / City of Coppell
~/ Larry Davis, P.E. / City of Coppell
PAUL S. UNZICKER, P.E.
President
DA~
~stimated Public
~roject. These
~tract documents
[blic Rights-of-
Lctors bid which
There contracts
~se fees are as
Fee x 1.5%
$ 162.00
3,475.80
3,638.37
$7,276.17
per agreement
within Samuel
to call.
D M. SCHNURBUSCH, P.E.
Vice President