Loading...
Meadows Addn 6-CS 890929 HORTON AND TOMNITZ. INC. 2221 EAST LAMAR BOULEVARD. SUITE 950 ARLINGTON, TEXAS ?6006 817-640-8200 September 29, 1989 Mr. Alan Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Update on Samuel Blvd. Construction Dear Mr. Ratliff: of pipe that the City ~ad added to ter contract :ol over his ~ting him to : he has not [ of control to rain and morning and ~etting out. ~d cars were ly apparent )r will move date" that he will be ~er Samuel First of all, the utility contractor is un with the M.U.D. Unfortunately, we have no cont: efficiency or scheduling. We have been requei utilize two crews on the job since he started, bu' complied. This is very frustrating to have a lac] over something that we are paying for. Secondly, we did lose six working days due wet soil. I have been on the job during the afternoon periods when school is starting and-~ Even when we had Samuel Blvd. rerOuted, buses al moving in and out of the school without al problems. As it stands right now, the paving contract~ on to the job on October 10. This is the "outsid~ the utility contractor has given me by Whicl finished with the storm sewer construction ul Blvd. This is the section our plans. Obviously, instructed to begin the improvements. Russell Doyle asked me to write you concernil%g the delay in our completion of the paving improvements to Samuel Boulevard. As you know, construction delays arT costly and benefit no one, but we have been unable to avoid them. At this point, two factors have contributed to the :onstruction schedule for Samuel being moved back. Mr. Alan Ratliff, City Manager Page 2 September 29, 1989 Please let me know if there is any further that I can provide to you regarding this matter. Sincerely, oru°n ViCe President GDJ/pm cc.: Russell Doyle information