Loading...
Northlake WE P10A-CS 880208 COPPELL PUBLIC WORKS February 8, 1988 TO: Steve Goram, Director of Public Works FROM: Steve Morton, Development Inspector RE: Northlake Woodlands 10A- History As per your request for overview history of Northlake Woodland 10, I submit the.., following: According to records submitted to me by Randy Fleming-of Ginn, Inc., Crawford Utility moved into site in latter, part Of May 1986. They completed the installation .of 1/2 of the total utilities for Northlake Woodlands (now known as "PH A") in September 1986. In August 1986 all water and sanitary sewer lines were tested and passed. The sanitary sewer was then T.V.'ed and a plug was placed on the down stream si'de of each man hole. The main line valves were opened by the city to keep water circulating. No work went forward' after September 1986, until I met with Jimmy Crawford and Mike Bonney in the 1st part of April 1987. At that time we opened all man .holes and found no excessive amount of water, other than condensation. Then a 5% deflected mandrell was pul~ed thru the s~wer mains and found lines to be free of debris, obstruction or any collapsing or disfigurement. All valve' stakes were intact and site showed no signs of water leakage, and all valves operated smoothly. In the latter part of May to first part of June, Mike Bonney of Bonney Construction started, their cement subgrade preparation and completed in the first of August. Paving started in August and was completed in 'October. Clean up, punch list item, and storm drain outfall modification were complete. Subdivision was accepted by city November 19, 1987. SMM/sm COPY