Meadows Addn 6-LR 890822TESTED FOR:
PROJECT:
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
DT CONSTRUCTION
C/O PAUL UNZICKER
Dallas. Texas
REPOeIT Of
COMPACTIOI
TEST DATA:
DATE: AU GUS T
MEADOWS SECTION 6 PHASE I OURe,ORTNO. 89104-i
Coppell. Texas
FIELD
I TESTS
22. 1989
.8
S EP 0 5 1989
PAUL S. UNZIC;KER, INO.
CO ~,'.SULTING ENGINEERS
MOIITU#E DRY DENSITY #OIITUEE D PER CENT COMMKNT'
NUMBER ~k pelf ql, GOMPAGTION
08/22/89 #9 LIFT 4 13.0 109.3 12 / 98 / 2-A
08/22/89 10 LIFT 3 15.5 106.9 14 1041u/ 98 / 2-A
F
08/22/89 11 LIFT 4 13.0 109.3 12 1051/!. 96 / 2-A
12 LIFT 3 15.5 106.9 14 104]/ 97 / 2-A
08/22/89
08/22/89 #1 LIFT 4 13.0 109.3 11 1041 /~ 95 / 2-A
/
08/22/89 #2 LIFT 4 13.0 109.3 10 1061/ 97 / 2-A
TEST LOCATION:
i BLOCK "R". LOT 4
2 BLOCK "R" LOT 4
3 BLOCK "R" LOT 4
4 BLOCK "R". LOT 4
5 BLOCK "R". LOT 1
6 BLOCK "R" LOT 2
1. FILL ~ ° A. TEST RESULTS COMPLY WITH SPECIFICATIONS Respecffull Submitted, / J ~~.~~'~
2. NATURAL SUBGRADE B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
3. C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TE ;TING, INC.
4. D. RETEST