Loading...
Meadows Addn 6-CS 890818The City With A Beautiful Future August 18, 1989 Mr. Gary Bennett Brazos Valley Construction Route 7 Box 327 Waco, Texas 76705 RE: Damage to Construction Meter on the Meadows Phase 6 Dear Mr. Bennett: The construction meter located on the above reference damaged again. It appears that the driver of the forgotten to disconnect the hose from the meter prior which caused a considerable amount of damage to the met~ The cost of the damage to the meter is $251.65 and bE a parts breakdown to show the cost of each replaced par 1- 2" 805Y Double Check $210.00 1- 2" Gate Valve $21.95 1- 2" Flange (bronze) $2.25 1- 2" 2~" Fire Thread x 2" IP Adapter $17.45 Total Cost $251.65 The cost of this repair will need to be paid at the Ci Department located at Town Center, 255 E. Parkway al the check what is being paid. If you have any questions concerning this matter, at 462-8495. Water Utilities Superintendent HLP/bb ~eve Goram, Director of Public Works cc: Marsha Hale, Water Billinm Coordinator P.O. Box 478 Coppell, Texas 75019 214-462-0022 Project project has been water truck had to driving away, low I have listed .y's Water Billing please note on )lease contact me