Meadows Addn 6-CS 890818The City With A Beautiful Future
August 18, 1989
Mr. Gary Bennett
Brazos Valley Construction
Route 7 Box 327
Waco, Texas 76705
RE: Damage to Construction Meter on the Meadows Phase 6
Dear Mr. Bennett:
The construction meter located on the above reference
damaged again. It appears that the driver of the
forgotten to disconnect the hose from the meter prior
which caused a considerable amount of damage to the met~
The cost of the damage to the meter is $251.65 and bE
a parts breakdown to show the cost of each replaced par
1- 2" 805Y Double Check $210.00
1- 2" Gate Valve $21.95
1- 2" Flange (bronze) $2.25
1- 2" 2~" Fire Thread x 2" IP Adapter $17.45
Total Cost
$251.65
The cost of this repair will need to be paid at the Ci
Department located at Town Center, 255 E. Parkway al
the check what is being paid.
If you have any questions concerning this matter,
at 462-8495.
Water Utilities Superintendent
HLP/bb
~eve Goram, Director of Public Works
cc:
Marsha Hale, Water Billinm Coordinator
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Project
project has been
water truck had
to driving away,
low I have listed
.y's Water Billing
please note on
)lease contact me