Loading...
Meadows Addn 6-CS 890809The City.With A Beautiful Future August 9, 1989 Mr. Gary Bennett Brazos Valley Contracting Rt 7 Box 327 Waco, Texas 76705 RE: Damage to Construction Meter for Meadows Phase 6 Dear Mr. Bennett: The construction meter set for the above referenced damaged by a worker operating the water truck. It he had failed to disconnect his truck before drivi~ the meter. Your company will be responsible for repairing this meter. The cost of the repair was $210.00 and this amount be paid at the City of Coppell Water Billing Department Boulevard (Town Center). If you have any questions regarding this matter, please Sincerely, Howard Pafford, Water Superintendent HLP/sm cc: s~eVe Goram, Director of Public Works P.O. Box 478 Coppell, Texas 75019 214-462-0022 project was appears that ~g away from the cost of will need to , 255 Parkway advise.