Loading...
ST9704-CS 990625 Coppell, Texas 75019 o%o% DCOPPELL, TEXAS 75019 June 25, 1999 Linda Mack 162 Shadydale Lane Coppell, Texas 75019 RE: West Town Center Drive construction Dear Mr. Within the next couple of weeks the City of Coppell will begin the construction of West Town Center Drive. The construction will consist of the extension of the existing road on the south side of Sonic Drive-In located at Denton Tap Road. The road will extend westward to Coppell High School (see Exhibit A). During the design of this project it was brought to our attention that a portion of your chainlink fence is in the existing right-of-way of Willow Lane. The proposed road extension of West Town Cemer Drive will be extended through a portion of the existing Willow Lane right-of- way. Therefore, in order for construction to proceed your fence will need to be relocated out of the right-of-way of Willow Lane. It is anticipated that the fence will need to be relocated by July 6, 1999 so that construction can continue. Your cooperation in expediting this request will be greatly appreciated. If you have any questions please call me at 972/304-3681 to discuss this matter. Sincerely, Michael Martin, P.E. Assistant City Engineer