Loading...
Meadows Addn 6-CS 890628PAUL S. UNZICKER, INC. CONSULTING ENGINEERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 (214) 634-3300 June 28, 1989 Mr. Larry Davis The City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Meadows Section Six - Phase One Coppell, Texas 86062 O Dear Mr. Davis: We have revised the Final Plat and Engineering Plans fo development consistent with your review comments found on the The revisions to these plans can be found on the plan set during our meeting on June 26, 1989. In addition to the revis plan set, the following should be noted regarding this project The City Council has requested that the Paving Improvement this project, especially in Samuel Boulevard, be comple beginning of the new school year. This was requested duri process to ensure adequate safety and traffic flow arou~ school located on the west side of Samuel Boulevard. Sidewalks are not required by City codes during Street Pay The sidewalks for those interior streets of this sub constructed by the builders for each lot. The sidewalk in will be constructed by the developer after all Street Pay the cost shared with St. Ann's Catholic Church. Th~ responsible for the sidewalk on the south side of Wood~ church is required to participate in this cost as requ, Council during the Platting process of their development. A trench safety plan and geotechnical investigation was c Testing Service, Inc., especially for this project. A cc was submitted to you under separate cover and has been Utility Contractors Contract Documents and Specifications A preconstruction meeting will be scheduled next week. it very much if you would provide me with a list of all p, attend. During this meeting, we will notify contractors the plans as originally approved, and of any concerns yc to them. PAUL S. UNZICKER, P.E. President DAN ' the referenced :eturned markups. submitted to you ions made to this associated with ~ed prior to the ng the Final Plat the elementary lng Improvements. ivision will be Samuel Boulevard .ng is completed; church is also noore Drive. The ~sted by the City onducted by Alpha py of the reports included in the would appreciate rsons you wish to of any changes to u wish to present ID M. SCHNURBUSCH, P.E. Vice President 'Page 2 Mr. Larry Davis June 28, 1989 I appreciate your comments regarding this plan set and look f~ with you during the construction phase of this development. questions, please call. Sincerely, Kevin R. Kefldrick, P.E. Project Manager KRK: kc cc: Gordon Jones / D.T. Construction, Inc. Jeff Hawkins / Pierce Lunsford, Inc. Russell Doyle / City of Coppell Kevin Pieffer / Ginn Inc. Howard Pofford / City of Coppell ~rward to working If you have any