Northlake WE P10A-CS 850509 Date.- 5-9-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Northlake Woodlands East No. 10
A. General
1. Development Name and size= Northlake Woodlands East
2. Owner= Troth Enterprises & Steve Parsons, Inc.
3. Engineer: Don A. Tipton
4. Current zoning: SF
5. Current status of development: Preliminary Plat
6. Location: W MacArthur Blvd., N Belt Line Road
7. Proposed density= To be determined
8. Annexation or land study required=
9. Issues resolved =
10. Issues to be resolved=
11. Dedications required=
B. Impact
1. Traffic:
a. Off-site collector streets: Mockingbird Lane 1000
b. Off-site arterial streets: MacArthur Blvd. 2000
2. Sewer:
a. Proposed mains: To be determine~
b. Proposed connections to existing mains: To be ~etermine~
3. Water= To be ~etermin~
4. Drainage or Flow= To be ~eterm~ne~
5. Schools =
a. Primary school= 300 students
b. Mi~le school= 150 students
C. Approvals an~ Fees
1. Fees ~
Fees Requ~ed
2. Assessments and Pro Ra~a Chargest
a. I t em: -.~._ .........'.....-..;,:.~.[.. · ' - ...... ..
Sugary ~ '-::- ..... . ...- ·
b. ltem~
- .--f-.~". '~.l-~
3. Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer: 5-9-85
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period: