Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 941110
CONCRETE CYLINDER TEST RESULTS PROJEOT: Northlake Woodlands ~10, Phase B LOCATION: Coppell JOB $: 94-1104 DATE OF BREAK: 11-10-94 DAY: Thursday CLIENT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS Inlet Box: 43 C @ Condor Dr* .... 10-13-94 28 110,500 3909 43 D @ Condor Dr* .... 10-13-94 28 111,000 3926 44 C @ Bethel School Rd .... 10-13-94 28 113,000 3997 44 D @ Bethel School Rd .... 10-13-94 28 114,000 4033 * Contractor made cylinders and provided location data. SPECIFICATIONS: 3600 psi @ 28 days SUPPLIER: Shane Robinson Technician