Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 941014
~ r-~ COF'--'~LTXN(3 ENGXNEBRH T~~, cnvi ro~uentst Assessments XSIm. SoILs & Foundations Construction MateriaLs Testing "ExceLLence by Experier~e" CGemercJet & Industrial Inspection PO Box 925&8 · SouthLake, Texas ?6092 · . (817) 329-0281 CONCRBTB CYLXNDBR TEST RESULTS PROJ'ECT: Northlake Woodlands $10, Phase B LO~ATION: Coppe11 JOB ~: 94-1104 DATE OF BREAK: 10-14-94 DAY: Friday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATE OF DAY~ I.D. LOCATXON (IN.) SIMPLE A~ED POUNDS PSI Alley A: 39 C @ Station 7+00 09-16-94 28 105,000 3714 39 D @ Station 7+00 09-16-94 28 105,500 3731 Alley D: 40 C @ Station 5+00 .... 09-16-94 28 107,500 3802 40 D @ Station 5+00 09-16-94 28 108,000 3820 SPBCIFICATIONH: 3600 psi @ 28 days SUPPLIER: Site Concrete Shone Robinson Technician DAILY (~ONBTRU(~TIOH RBPORT PROJBCT: Northlake Woodlands #10, Phase B LOC~TION: Coppell JOB $: 94-1104 D~TE: 10-14-94 D~Y: Friday TIME: 11am-1pm CLIENT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering AOTIVITIEH: WB~TH~: Overcast LOW TBMP: 60F HIGH TB~P: 70F Travelled to job site, as requested, to pick up ten (10) concrete test cylinders made by contractor on various dates. Returned to office. Shane Robinson Technician