Loading...
Northlake WE P10B-LR 941010~(~Ol~l .nvi romentaL Aasesmaents ~' SaiLs & Foundations Construction MateriaLs Testing "ExceLLence by Experience- CewmercJaL & Incluatriai inspection PO Box 92548 · SouthLake, Texas 76092 · (817) 329-0281 CONCRBTB CYLINDBR TBHT RBBULT8 PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB ~: 94-1104 DATE OP BREAK: 10-10-94 DAY: Monday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. BLUMP DATE OF DAYB I.D. LOCATION (IN.) SAMPLE AGED POUNDH PSI Bethel School Rd: 23 C @ Station 15+00 3.75" 09-12-94 28 93,000 3289 23 D @ Station 15+00 3.75" 09-12-94 28 92,000 3254 24 C @ Station 16+50 2.0" 09-12-94 28 93,500 3307 24 D @ Station 16+50 2.0" 09-12-94 28 93,000 3289 25 C @ Station 18+00 3.5" 09-12-94 28 95,500 3378 25 D @ Station 18+00 3.5" 09-12-94 28 94,500 3342 26 C @ Station 19+50 2.75" 09-12-94 28 97,000 3431 26 D @ Station 19+50 2.75" 09-12-94 28 96,500 3413 27 C @ Station 21+00 2.0" 09-12-94 28 93,500 3307 27 D @ Station 21+00 2.0" 09-12-94 28 94,000 3325 28 C @ Station 22+50 2.5" 09-12-94 28 94,500 3342 28 D @ Station 22+50 2.5" 09-12-94 28 94,000 3325 29 C @ Station 24+00 3.0" 09-12-94 28 96,500 3413 29 D @ Station 24+00 3.0" 09-12-94 28 96,000 3395 30 C @ Station 25+50 2.75' 09-12-94 28 94,000 3325 30 D @ Station 25+50 2.75" 09-12-94 28 94,500 3342 31 C @ Station 27+00 3.0" 09-12-94 28 94,500 3342 31 D @ Station 27+00 3.0" 09-12-94 28 95,000 3360 32 C @ Station 28+50 3.25" 09-12-94 28 96,500 3413 32 D @ Station 28+50 3.25" 09-12-94 28 96,000 3396 (Continued on next page) PAGE 2 JOB ~: 94-1104 DATE: 10-10-94 mmm m mmmmmmmmm mm mmmmmmmm, m mmmmmm! CYL. B~MP D~TB OP D&YB i.D. LOC~TXON (iN.) BWLB &GBD POUNDB PBX 33 C @ Station 30+00 2.75~ 09-12-94 28 93,000 3289 33 D @ Station 30+00 2.75" 09-12-94 28 94,000 3325 34 C @ Station 31+50 3.5" 09-12-94 28 94,500 3342 34 D @ Station 31+50 3.5" 09-12-94 28 94,000 3325 35 C @ Station 33+00 2.75~ 09-12-94 28 94,500 3342 35 D @ Station 33+00 2.7§~ 09-12-94 28 95,000 3360 36 C @ Station 34+00 2.25" 09-12-94 28 96,000 3395 36 D @ Station 34+00 2.25~ 09-12-94 28 96,500 3413 · PBCXFXC&TION~: 3000 psi @ 28 days BUPPLX~R: Site Concrete Patrick Corbett Technician