Loading...
Northlake WE P10B-LR 941007 CONCRETE CYLXHDBR TEHT RBHULTfJ PROJECT: Northlake Woodlands $10, Phase B LOCATION: Coppell JOB $: 94-1104 DATE OF BRFJ~K: 10-07-94 D~Y: Friday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP D&TB OF DAYH I.D. LOCATION (iN.) BItMPLE AGED POUNDB PBX Alley A: 20 C @ Station 13+00 2.5" 09-09-94 28 91,500 3237 20 D @ Station 13+00 2.5jj 09-09-94 28 92,000 3254 21 C @ Station 8+00 3.0" 09-09-94 28 88,500 3131 21 D @ Station 8+00 3.0" 09-09-94 28 89,000 3148 Alley B: 22 C @ Station 3+00 2.75" 09-09-94 28 92,000 3254 22 D @ Station 3+00 2.75" 09-09-94 28 92,500 3272 8PBCIFIC&TIONH: 3000 psi @ 28 days 8UPPLIER: Patrick Corbett Technician