Northlake WE P10B-LR 940922 DAILY CONSTRUCTION RBPORT
PR(kTBCT: Northlake Woodlands #10, Phase B LO~ATION: Coppell
JOB #: 94-1104 DATE= 09-22-94 DAY= Thursday TIME: 9=00-11=00am
CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete
c/o Tipton Engineering
NRATHBR= Sunny LOW TEl(P: §8F HIGH TBMP: 78F
Travelled to job site, as requested, to pick up sixteen
(16) concrete test oylinders made by contractor on various
dates. Returned to office.
Shane Robinson
Technician
COMCRBTB CYLZm)n TBBT RBBULTB
PROJECT: Northlake Woodlands ~10, Phase B LOCATION: Coppell
JOB ~: 94-1104 DATE OF BREAK: 09-22-94 DAY: Thursday
CLIRNT: Fircon Venture LTD CONTRACTOR: Site Concrete
c/o Tipton Engineering
CYL. SLUMP DATB OF DAY~
I.D. LO~TION (IN.) HAMPLB AGBD POUNDS PSI
Alley Dc
37 A @ Station 8+50 .... 09-15-94 7 92,500 3272
37 B @ Station 8+50 .... 09-15-94 7 94,000 3325
HPBCIFICATIONO: 3600 psi @ 28 days
HUPPLZBR: Site Concrete
Patrick Corbett
Technician