Loading...
Northlake WE P10B-LR 940922 DAILY CONSTRUCTION RBPORT PR(kTBCT: Northlake Woodlands #10, Phase B LO~ATION: Coppell JOB #: 94-1104 DATE= 09-22-94 DAY= Thursday TIME: 9=00-11=00am CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering NRATHBR= Sunny LOW TEl(P: §8F HIGH TBMP: 78F Travelled to job site, as requested, to pick up sixteen (16) concrete test oylinders made by contractor on various dates. Returned to office. Shane Robinson Technician COMCRBTB CYLZm)n TBBT RBBULTB PROJECT: Northlake Woodlands ~10, Phase B LOCATION: Coppell JOB ~: 94-1104 DATE OF BREAK: 09-22-94 DAY: Thursday CLIRNT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. SLUMP DATB OF DAY~ I.D. LO~TION (IN.) HAMPLB AGBD POUNDS PSI Alley Dc 37 A @ Station 8+50 .... 09-15-94 7 92,500 3272 37 B @ Station 8+50 .... 09-15-94 7 94,000 3325 HPBCIFICATIONO: 3600 psi @ 28 days HUPPLZBR: Site Concrete Patrick Corbett Technician