Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940921
CONCReTe CYLXNDBR TeST RBSULT8 PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB ~: 94-1104 DATE OF BRB~K: 09-21-94 DAY: Wednesday CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering CYL. 8LUMP DATE OF DAY8 I · D. LOCATION ( XN. ) 8M(PLE AGED POUNDS PSI Alley C: 38 A @ Station 1+00 .... 09-14-94 7 91,500 3236 38 B @ Station 1+00 09-14-94 7 95,000 3360 SPBCXFICATIONS: 3600 psi @ 28 days SUPPLIER: Site Concrete Shane Robinson Technician