Northlake WE P10B-LR 940912 DAILY CONBTRUCTION REPORT
PROJECT: Northlake Woodlands ~10, Phase B LOCATION: Coppell
JOB ~: 94-1104 DATE: 09-12-94 DAY: Monday TIME: 6:30am-3:00pm
CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete
c/o Tipton Engineering
ACTIVZTZBB:
WEATHER: Ptly Cloudy & Humid LOW TFJ(P: 71F HIGH TEMP: 88F
Travelled to job site, as requested, to make fifty-six (56)
concrete test cylinders and to pick up twelve (12) test
cylinders made on 09-09-94. Returned to office.
SET #23
LOCATION: Bethel School Rd @ Station 15+00
BLUMP: 3.75" AIR: 5.0% TBMP: AT 77/CT 81 TIME: 7:30am
SET ~24
LOCATION: Bethel School Rd @ Station 16+50
ELUMP: 2.0" AIR: 4.7% TRMP: AT 77/CT 81 TIME: 8:00am
SET #25
LOCATION: Bethel School Rd @ Station 18+00
BLUMP: 2.5' AIR: 5.2% TBMP: AT 78/CT 82 TIME: 8:30am
SET ~26
LOCATION: Bethel School Rd @ Station 19+50
ELUMP: 2.75" AIR: 4.8% TEl(P: AT 78/CT 81 TIME: 9:00am
SET #2?
LOCATION: Bethel School Rd @ Station 21+00
BLUMP: 2.0" AIR: 5.0% TEMP: AT 81/CT 82 TIME: 9:30am
(Continued on next page)
PAGE 2
JOB #: 94-1104
DATE: 09-12-94
SBT #28
LOCATION: Bethel School Rd @ Station 22+50
BLUMP: 2.5" &IR: 5.1% TEMP: AT 81/CT 82 TIME: 10:00am
s~ ~29
LO~ATION: Bethel School Rd @ Station 24+00
SLUMP: 3.0" AIR: 4.8% TEl(P: AT 83/CT 84 TIME: 10:30am
SET #30
LO~ATION: Bethel School Rd @ Station 25+50
SLUMP: 2.75" AIR: 4.9% TBMP: AT 83/CT 85 TIME: 11:00am
SET #31
LOCJ~TION: Bethel School Rd @ Station 27+00
BLUMP: 3.0" AIR: 5.0% TRMP: AT 86/CT 88 TIME: 11:30am
SET #32
LOC~TION: Bethel School Rd @ Station 28+50
SLUMP: 3.25" AIR: 5.0% TEMP: AT 81/CT 90 TIME: 12noon
SET $33
LO~ATION: Bethel School Rd @ Station 30+00
SLUMP: 2.75" AIR: 5.2% TEl(P: AT 88/CT 90 TIME: 12:30pm
SET #34
LOCATION: Bethel School Rd @ Station 31+50
SLUMP: 3.5" AIR: 5.0% TRMP: AT 88/CT 91 TIME: 1:00pm
s~ #35
LOCATION: Bethel School Rd @ Station 33+00
SLUMP: 2.0" AIR: 4.7% TRMP: AT 88/CT 90 TIME: 2:00pm
SET #36
LOCATION: Bethel School Rd @ Station 34+00
SLUMP: 2.25# AIR: 5.0% TRMP: AT 88/CT 92 TIME: 2:30pm
Patrick Corbett
Technician