Northlake WE P10B-LR 940909 DAILY OONBTRUGTION REPORT PROJECT: Northlake Woodlands ~10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE: 09-09-94 DAY: Friday TIME: 6:30am-l:30pm CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete o/o Tipton Engineering ACTIVITIES: WB~TH~: Ptly Cloudy & Mild LOW TEMP: 65F HIGH TEMP: 85F Travelled to job site, as requested, to make twelve (12) concrete test cylinders and to pick up four (4) test cylinders made on 09-08-94. Returned to office. SET ~2o LOOAT~ON: Alley A @ Station 13+00 SLUMP: 2.5" AIR: 5.0% TEMP: AT 75/CT 78 TIME: 8:30am SET #21 LO~ATION: Alley A @ Station 8+00 SLUMP: 3.0" AIR: 5.1% TBMP: AT 77/CT 78 TIME: lO:00am SET ~22 LOCATION: Alley B @ Station 3+00 SLUMP: 2.75" AIR: 5.0% T~P: AT 77/CT 81 TIME: 1:00pm Patrick Corbett Technician