Northlake WE P10B-LR 940909 DAILY OONBTRUGTION REPORT
PROJECT: Northlake Woodlands ~10, Phase B LOCATION: Coppell
JOB #: 94-1104 DATE: 09-09-94 DAY: Friday TIME: 6:30am-l:30pm
CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete
o/o Tipton Engineering
ACTIVITIES:
WB~TH~: Ptly Cloudy & Mild LOW TEMP: 65F HIGH TEMP: 85F
Travelled to job site, as requested, to make twelve (12)
concrete test cylinders and to pick up four (4) test
cylinders made on 09-08-94. Returned to office.
SET ~2o
LOOAT~ON: Alley A @ Station 13+00
SLUMP: 2.5" AIR: 5.0% TEMP: AT 75/CT 78 TIME: 8:30am
SET #21
LO~ATION: Alley A @ Station 8+00
SLUMP: 3.0" AIR: 5.1% TBMP: AT 77/CT 78 TIME: lO:00am
SET ~22
LOCATION: Alley B @ Station 3+00
SLUMP: 2.75" AIR: 5.0% T~P: AT 77/CT 81 TIME: 1:00pm
Patrick Corbett
Technician