Loading...
Northlake WE P10B-LR 940826 ~0'- ~ COF~LTIN(] ENGINEL'R~ ~ SoiLs ~ F~ti~ C~tr~ti~ Hateriale Testi~ "~ceLi~e ~ ~ri~e" C~rctat & [~trlai ~ Box 9~48 · S~thteke, Texas 7~ · (817) 3~-0281 FIELD O0~&~IOM REPORT PROJECT: Northlake Woodlands $10, Phase B LOCATION: Coppe11 JOB $: 94-1104 DATE: 08-26-94 DAY: Friday TIME: 7:30am CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering WATER DRY PER- TF~T PROCTOR CONT. DEN CENT MO. LOCATIOMANDLIFT NUMBER (%) (PCF) COMP mmmmmmmmmmmmmmmmmmmmmmmammmmmmmmt Alley D: 1. @ Station 8+50 FG 4 21.6 94.1 90.6* 2. @ Station 3+50 FG 4 24.1 91.8 88.4* Alley H: 3. @ Station 0+25 FG 4 20.4 93.6 90.1, Alley A: 4. @ Station 4+00 FG 4 18.4 100.1 96.4 REMARKS: All tests failed, except for Test S4 which passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 4. Lime Treated Brown Clayey Sand 103.8 PCF @ 17.'4% MOISTURE Patrick Corbett Technician