Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940823
~r~~ ~nvi rorsaentoL A~ses~mts ~. SoiL. & Foundations Construction I~teriaLs Testi~ "~ceLL~e ~ ~rJ~e" C~rcJaL & ]~trJat ]n~tJ~ ~ Box ~ · S~thLake, Texae 7~ · (:817) 3~-0281 LTl(RD BUBGRADB (JRAD&TION RBPORT PRC)JBC'T: Northlake Woodlands $10, Phase B LOCATION: Coppell JOB ~c 94-1104 DATBc 08-23-94 D~Yc Tuesday CLZ~NTc Fircon Venture LTD CONT~ACTORc Site Concrete c/o Tipton Engineering % P~BBZNQ % PI%BBINQ LO~ATZON 1 1/2" BIE~B #4 BI~VB Redwing Dr: i @ Station 1+00 100.0% 82.4% 2 @ Station 4+00 100.0% 80.5% 3 @ Station 6+50 100.0% 74.6% 4 @ Station 9+00 100.0% 77.1% Willet Dr: 5 @ Station 1+00 100.0% 70.3% 6 @ Station 4+00 100.0% 84.2% BPBCIFIC&TZONB: 100.0% Passing 1-1/2" Sieve 60.0% Passing $4 Sieve R~NARKB: Collected two (2) soil samples for Lime Treated Moisture-Density Relations $4 and #5 at same time. Patrick Corbett Technician