Loading...
Northlake WE P10B-LR 940822~11~, SoILs & Foundations Construction #at@riaLs Testing "ExceLLence by Experience" C~merclaL & industrial inspection PO Box 925~8 · SouthLake, Texas 7609~ · (817) 329-07.81 LXMBD BUBgRADB GRAD&TXON RBF~)RT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB ~: 94-1104 DATE: 08-22-94 DaY: Monday CLX~NT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering % P~BBXNG % P~BBING LOC~TION I 1/2"' SIEVE ~4 SIEVE Bethel School Rd: i @ Station 16+00 100.0% 67.8% 2 @ Station 19+00 100.0% 62.9% 3 @ Station 22+00 100.0% 65.8% 4 @ Station 25+00 100.0% 81.0% 5 @ Station 28+00 100.0% 77.3% 6 @ Station 31+00 100.0% 71.2% 7 @ Station 34+00 100.0% 69.5% SPECIFICATIONS: 100.0% Passing 1-1/2" Sieve 60.0% Passing $4 Sieve RBMARKB: Collected one (1) soil sample for Lime Treated Moisture-Density Relations #3 at same time. Jeff Holden Technician