Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940725
.~vir~tat Asses~ts SoiLs & F~ti~ C~tr~tim Na~er~ats Test~ ~rciat & l~triat Ins~t~ Box ~8 · S~thteke, Texas 7~ · (817) ]~-0281 FTBLD COMPACTION REPORT PROJBCT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB $: 94-1104 D~TR: 07-25-94 D~Y: Monday TIMR: 10:00am CLIBNT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering W~TER DRY PER- TEST PROOTOR CONT. DEN CENT NO. LOC&TION/%ND LIFT NUMBER (%) (PCF) COMP Water Service: 1. @ Block 9, Lot I 3rd Lift 2 28.1 94.1 96.4 2. @ Block 9, Lot 4 3rd Lift I 17.6 105.2 98.5 3. @ Block 9, Lot 17 3rd Lift 2 26.3 95.9 98.2 4. @ Block 11, Lot 2 2nd Lift i 18.5 104.2 97.5 5. @ Block 11, Lot 9 3rd Lift 2 27.9 93.0 95.2 6. @ Block 13, Lot 2 2nd Lift i 19.4 104.5 97.8 7. @ Block 14, Lot 9 3rd Lift i 20.1 103.1 96.5 8. @ Block 14, Lot 15 FG i 18.3 105.4 98.6 Sanitary Sewer Service: 9. @ Block 11, Lot 2 3rd Lift I 20.1 103.4 96.8 10. @ Block 11, Lot 9 2nd Lift i 20.9 101.9 95.4 11. @ Block 13, Lot 24 3rd Lift 2 26.4 95.1 97.4 12. @ Block 14, Lot 9 3rd Lift i 17.9 106.0 99.2 13. @ Block 14, Lot 15 2nd Lift i 19.6 102.9 96.3 RBMARKB: All tests passed. Minimum Compaction Required: 95% FG = Final Grade Also picked up four (4) concrete test cylinders made on 07-22-94 by contractor. PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician