Northlake WE P10B-LR 940721
FIELD COMPACTION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppe11 JOB ~: 94-1104 DATE: 07-21-94 DAY: Thursday TIME: ll:30am CLIENT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LO~ATION /%ND LIFT NUMBER (~) (PCF) COMP Line B, 30" Storm Sewer: 1. @ Station 2+00 2nd Lift I 19.4 104.8 98.1 2. @ Station 5+00 2nd Lift i 19.0 103.5 96.9 Line B, 21'' stOrm Sewer: " 3. @ Station 8+00 2nd Lift 1 17.8 105.0 98.3 4. -@-Station 11+00 2nd Lift i 20.1 103.9 97.2 REMARKS: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1~ BroWn Silty C~ay 106.8 PCF @ 17.3% MOISTURE Jeff Holden Technician