Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940623
FIELD COMPACTION REPORT PROJECT: Northlake Woodlands LO~&TION: Coppe11 JOB ~: 94-1123 D&TE: 06-23-94 D~Y: Thursday TIME: 9:00am CLIENT: Legend Construction CONTRACTOR: Legend Construction W&TZR DRY PER- TEST PROCTOR CONT. DEN CENT NO. LO~&TION IRD LIFT NUMBER (%) (PCF) COHP mamam mmmmmmm mmm mmmmmmmmmm~ Line A, 8" Sanitary Sewer: 1. @ Station 8+50 2.5' below I 26.4 92.8 95.2 2. @ Station 6+50 2.5' below i 24.1 93.2 95.6 3. @ Station 5+50 2.5' below 1 26.7 94.1 96.4 4. @ Station 4+50 2.5' below i 23.8 94.0 96.5 5. @ Station 2+50 2.5' below i 24.2 93.6 96.0 6. @ Station 1+00 2.5' below I 26.9 93.4 95.8 REI(~RKH: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Tan & Brown Silty Clay with Calcareous Nodules 97.4 PCF @ 25.0% MOISTURE Patrick Corbett Technician