Northlake WE P10B-LR 940613
F~ELD COMPaCTiON REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppe11 JOB $: 94-1104 DATE: 06-13-94 DAY: Monday TIME: 10:30am CLIERT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering W~TER DRY PER- TEBT PROCTOR CONT. DEN CENT NO. LOCATION ANDLIFT NUMBER (%) (PCF) COMP Line G, 8" Sanitary Sewer: 1. @ Station 2+00 2nd Lift 1 20.1 104.1 97.4 Line E, 8" Sanitary Sewer: 2. @ Station 2+00 3rd Lift 2 27.3 93.9 96.2 3. @ Station 5+50 2nd Lift 2 26.1 95.1 97.4 RR)ULRKB: All tests passed. Minimum Compaction Required: 95% Minimum of 4 tests per trip. PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician