Northlake WE P10B-LR 940609
FIELD COMPACTION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE: 06-09-94 DAY: Thursday TIME: 1:30pm CLIENT: Fircon Venture LTD CONTRACTOR: S & S Utilities c/o Tipton Engineering. WATER DRY PER- TEBT PROCTOR CONT. DEN CENT ~O. LOCATZO~ AND L~YT NUMBER (%) (PCY) COMP Line H, 8" Sanitary Sewer: 1. @ Station 1+50 2nd Lift i 20.1 103.2 96.6 2. @ Station 5+00 3rd Lift 2 26.9 95.4 97.7 3. @ Station 8+50 3rd Lift 2 26.4 94.9 97.2 Line E, 8" Sanitary Sewer: 4. @ Station 2+00 2nd Lift 2 27.1 95.1 97.4 .:.. .-. , . . ..j.:. ~'" ;.~.: ., _. , Line C,-8,, Sanitary:Sewer: ~-.'' 5. @ Station 3+00 4th Lift 2 28.4 93.9 96.2 6. @ Station 6+00 2nd Lift i 19.4 103.0 96.4 Line D, 8" Sanitary Sewer: 7. @ Station 1+50 3rd Lift 2 26.6 95.8 98.1 REMARKS: All tests passed. Minimum Compaction Required: 95% PROCTORS'. 1. "Brown Silty"Cla~" .... 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown C!gyey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician