Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P10B-LR 940413
ebb- ~ CON,~I~.LTING ENGTNEERS TN** ~~e ~v~ r~n~at Assessors ~ Sci ts & Fo~ati~s Co~str~ti~ Hateriats Testing *'~ceite~e ~ ~ri~et* C~rciei & l~strJaL Ins~c~J~ ~ Box 925~ · S~thtake, Texas 7~2 · (817) 3~-0281 FIELD COMPACTION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB $: 94-1104 DATE: 04-13-94 DAY: Wednesday TIME: 9:00am CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION ]tND LIFT NUMBER (%) (PCF) COMP Block C: 1. @ Lot 19 FG 1 19.7 104.1 97.4 2. @ Lot 17 FG 2 28.2 93.9 96.2 3. @ Lot 12 FG 2 27.3 95.4 97.7 4. @ Lot 14 FG i 17.9 106.0 99.2 Block A: 5. @ Lot 23 FG i 18.6 103.2 96.6 6. @ Lot 22 FG i 19.3 105.1 98.4 7. @ Lot 17 FG 2 28.1 94.1 96.4 8. @ Lot 15 FG i 19.3 104.8 98.1 REMARKS: All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician