Loading...
Northlake WE P10B-LR 940412 FIELD COMPACTION REPORT PROJECT: Northlake Woodlands #10, Phase B LOCATION: Coppell JOB #: 94-1104 DATE: 04-12-94' DAY: Tuesday TIME: 9:00am CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block F: 1. @ Lot 2 FG i 19.2 104.7 98.0 2. @ Lot 4 FG i 20.0 103.8 97.1 3. @ Lot 6 2nd Lift i 17.9 105.2 98.5 4. @ Lot 8 2nd Lift i 18.2 104.0 97.3 Block B: 5. @ Lot I FG 1 19.3 103.8 97.1 6. @ Lot 3 FG 2 26.8 94.2 96.5 7. @ Lot 5 FG I 19.2 104.8 98.1 8. @ Lot 7 2nd Lift 2 27.3 95.3 97.6 9. @ Lot 9 2nd Lift 2 28.9 94.0 96.3 10. @ Lot 11 2nd Lift i 20.3 102.7 96.1 Block C: 11. @ Lot 10 2nd Lift i 18.2 104.6 97.9 12. @ Lot 12 2nd Lift 2 26.9 95.2 97.5 13. @ Lot 14 2~d T, ift 2 25.8 96.2 98.5 14. @ Lot 16 2nd Lift 1 17.8 103.8 97.1 15. @ Lot 18 2~d Lift 2 27.3 93.9 96.2 16. @ Lot 20 2nd Lift 2 26.2 94.8 97.1 RBMARKB: All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician