Northlake WE P10B-LR 940406 FZELD COMP&CTZON REPORT PROJECT: Northlake Woodlands $10, Phase B LOCATION: Coppe11 JOB ~: 94-1104 D~TE: 04-06-94 D~Y: Wednesday TIME: 1:30pm CLIENT: Fircon Venture LTD CONTRACTOR: Site Concrete c/o Tipton Engineering' W~TRR DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION &ND LIFT NUMBER (%) (PCF) COMP Block E: 1. @ Lot i 1st Lift 2 26.6 93.9 96.2 2. @ Lot 3 1st Lift 2 28.0 95.2 97.5 3. @ Lot 2 2nd Lift 2 26.3 94.7 - 97.0 4. @ Lot 4 2nd Lift 2 25.9 96.3 98.6 Alley F: 5. @ Station 2+00 1st Lift I 19.3 102.3 95.7 6. @ Station 2+50 2nd Lift i 20.3 104.3 97.6 Falcon: 7. @ Condor 1st Lift 2 27.1 96.1 98.4 Bethel School Rd: 8. @ Station 17+00 1st Lift 1 17.3 104.1 97.4 9. @ Station 20+00 1st Lift i 19.3 104.7 98.0 REMARKS: All tests passed. Minimum Compaction Required: '95% PROCTORS: 1. Brown Silty Clay 106.8 PCF @ 17.3% MOISTURE 2. Tan & Brown Clayey Sand 97.6 PCF @ 25.1% MOISTURE Jeff Holden Technician