Loading...
Meadows Addn 6-CS 890608PAUL S. UNZICKER, INC. CONSULTING ENGINEERS 8700 STEblMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 (214) 634-3300 June 8, 1989 Mr. Kevin Pieffer, P.E. Ginn, Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 Re: Meadows Section 6 - Phase One Coppell, Texas Job No. 86062 ( IN Dear Kevin: The attached Final Plat and Engineering Plans have been revis~ dated June 6th, and our phone conversation on the same day. an itemized listing of all changes made to this plan set. T1 as follows: SHEET 6: Storm Sewer Plan and Profile The existing 8 foot inlet in Meadow Run has been upg inlet. This will be done by adding a 6 foot inlet o the existing inlet. The lower portion of the North inlet will be broken out such that the additiona~ proposed 6 foot inlet can be conveyed to the 48 inch 2. The note below sections A-A, and B-B (Positive Ovel been revised to show 1.0 feet of freeboard. FINAL PLAT The finished floor elevations on those lots adjac~r overflow swales throughout this development have reflect those elevations shown on the Storm Sewer (Sheet 6) and the Lot Grading Plan (Sheets 14 and 15 LOT GRADING PLAN The developer of this project has contacted authorities of St. Anne's Catholic Church that grade along their North property line. It is my undez Church has no problem with the grading work because Woodmoore Drive improved. PAUL S. UNZICKER, P.E. President INC, ~d per your letter Please find below tese revisions are caded to a 14 foot ~ the North end of Eace of the 8 foot runoff from the storm sewer main. flow Swales) have t to the positive been revised to Plan and Profile nd notified the s will be modified standing that the they wish to have ~ID M. SCHNURBUSCH, P.E. Vice President These revisions have been made per your request. Also, pleas~ the Trench Safety Plan (report) will be included with the Col and Specifications as discussed by phone. If you have any please contact me as soon as possible as we would like to bel when the Final Plat has been approved by the City Council or have awarded an Excavation Contract with Brazos Valley Contr~ will begin mobilizing on June 13th. It is important that w review comments addressed before June 14th. Thank you for your cooperation that you have given us during th of these plans. Your hard work is deeply appreciated. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bd cc: Gordon Jones / Horton & Tomnitz, Inc. Russell Doyle / City of Coppell .~ make note that~~_~ ~ ltract Documentss~ in construction June 13th. We :tors, and they get any other review procesM