Meadows Addn 6-CS 890608PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
8700 STEblMONS FREEWAY, SUITE 400
DALLAS, TEXAS 75247
(214) 634-3300
June 8, 1989
Mr. Kevin Pieffer, P.E.
Ginn, Inc.
17103 Preston Road
Suite 100, LB 118
Dallas, Texas 75248
Re:
Meadows Section 6 - Phase One
Coppell, Texas
Job No. 86062
( IN
Dear Kevin:
The attached Final Plat and Engineering Plans have been revis~
dated June 6th, and our phone conversation on the same day.
an itemized listing of all changes made to this plan set. T1
as follows:
SHEET 6: Storm Sewer Plan and Profile
The existing 8 foot inlet in Meadow Run has been upg
inlet. This will be done by adding a 6 foot inlet o
the existing inlet. The lower portion of the North
inlet will be broken out such that the additiona~
proposed 6 foot inlet can be conveyed to the 48 inch
2. The note below sections A-A, and B-B (Positive Ovel
been revised to show 1.0 feet of freeboard.
FINAL PLAT
The finished floor elevations on those lots adjac~r
overflow swales throughout this development have
reflect those elevations shown on the Storm Sewer
(Sheet 6) and the Lot Grading Plan (Sheets 14 and 15
LOT GRADING PLAN
The developer of this project has contacted
authorities of St. Anne's Catholic Church that grade
along their North property line. It is my undez
Church has no problem with the grading work because
Woodmoore Drive improved.
PAUL S. UNZICKER, P.E.
President
INC,
~d per your letter
Please find below
tese revisions are
caded to a 14 foot
~ the North end of
Eace of the 8 foot
runoff from the
storm sewer main.
flow Swales) have
t to the positive
been revised to
Plan and Profile
nd notified the
s will be modified
standing that the
they wish to have
~ID M. SCHNURBUSCH, P.E.
Vice President
These revisions have been made per your request. Also, pleas~
the Trench Safety Plan (report) will be included with the Col
and Specifications as discussed by phone. If you have any
please contact me as soon as possible as we would like to bel
when the Final Plat has been approved by the City Council or
have awarded an Excavation Contract with Brazos Valley Contr~
will begin mobilizing on June 13th. It is important that w
review comments addressed before June 14th.
Thank you for your cooperation that you have given us during th
of these plans. Your hard work is deeply appreciated.
Sincerely,
Kevin R. Kendrick, P.E.
Project Manager
KRK/bd
cc: Gordon Jones / Horton & Tomnitz, Inc.
Russell Doyle / City of Coppell
.~ make note that~~_~ ~
ltract Documentss~
in construction
June 13th. We
:tors, and they
get any other
review procesM