Meadows Addn 6-CS 890525 (2)May 25, 1989 PAUL S. UNZICKER, INC. CONSULTING F'NGiNEERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS ?5247 (214) 634-3300 Mr. Kevin Pi,fret', P.E. Ginn, Inc. 17103 Preston, Suite 100 Dallas, Texas 75248 , Re: Meadows Section 6 - Phase One; Coppell, Texas Job No. 86062 Dear Kevin: The attached Final Plat and Engineering Plans have been revis,~d per our meetimg on May 17, 1989, and your review comments found on the returned'markupsl;i Please find below an itemized listing of all changes made to this-plan set.~ The revisions are as follows: Sheet 2: Final Plat 1. Fifteen foot Drainage and Utility Easements have been downstream of all street sags (Positive overflow). lots Sheet 3: Water and Sanitary Sewer Plan General note number 19 has been confirmed with the City Engineer for the Coppell Municipal Utility District, and Sheet 5: Drainage Area Map /~ As mentioned previously, easements have been provided )etween ~ downstream of all street sags. These e.asements_ can be [ound on v' - ' ~ S~et 6= S~o~ Sewer Plan and Prof~l~ /[, As d~scussed ~n our meeting, ~he Standard 2-sra~e in ~n alle (Nor~heas~ corner of Meadows Section 6) w~ll remain as exhibit. ~o~ensur ei~Che~C ~cy~ghaC~adeq ,pr ovided~f o~Lo =~,o f~Block~Of~ (fu ~ur e=develo The proposed drainage swales (for positive overflow downstream of all street sags have been revised to freeboard above the lO0-year storm event. ,etween those one (1) f. PAUL S, UNZICKER, PrUdent M. SCHNURBU~, P.E. Vice Pruidmt Sheet 8: Pavin$ Plan and Profiles 1. As discussed in our meeting, general note Geotechnical Report has been completed for this project. Plan has also been submitted by the Geotechnical Engin attached one copy of each report. :::~.. ~ you requested at the Planning and Zoning hearing this past Thursday night, I have investigated' the drainage problem in S~uel Boulevard n the vicinity of the Meadow Ridge Development. .percen~ ~ you ~ow, the street section is only one half , when our development ~s completed. .~b~b~ >:.<~due~ng?:,the:dX$~ha<g~ ~n~the>H~ado~R~dge~vfe~n'~' ~}from~7~~ ~nlet eonf~gurat~ona: two (2) ~n S~ueZ BouZevard, and t~ (2) ~n ~oo~oo~' Dr~ve. ~ot onZy have we reduced the d~$eharge by nearZy ~7 els, ~ have ~..:: doub~ed the capacity ~n SamueZ Boulevard (f~om 11.7 era to ~3.~ els) ~n 1oeat~on (by pav~ng the aeeond hail of the street). On the .~v~n~ng of Hay 1989, the n~ght of the aevere rain stoma ~n the DaZZaa/Fgrt ~o~th ncea, v~$~ted the a~te to aee ho~ extena~ve the drainage probiem ae~talZy was. on $~te, ~ w~tneaaed an extremely Zarge amount of runoff coming out of Anne Church parking Zot, and from the h~ZZ just ~orth of]the Chuceh $~te. ~runo f ~iwas~over ~ opp ing::: the~ curb&::and:~.e~e ring~th~~dg~eve~op~n~. is our engineering 3udgement that our Paving and Drai'~age Improvements associated ~ith the Headow Ridge Section 6 Development ~ill elevate the drainage problem you spoke of. I believe that any additional iaprovements ~ill- be an overkill to the problea. Also at your request, we have provided additional spot shots in the Headow Ridge Drive. ~sheet;~:the:~high;;point'~ina~.the~;Drive~is:~not:~:quite~s~tinchea ai$K~ Bo~ever~ as mentioned above, the Drainage Improvements ~ill el~inat~ any runoff entering into the Headow Ridge Developaent. If you have any additional comments regarding this developme at your earliest convenience. I have talked with Howard informed Russell Doyle (by phone) of his approval of these Hawkins has begun "advertising for bid" of this project (Uti Thursday, May 18th. I would appreciate it very much if Doyle that these plans are acceptable for construction. Sincerely, Kevin R. P. E. Project Manager KRK/bd Enclosures CC: Howard Pafford - City of Coppell Russell Doyle - City of Coppell Gordon Jones - DT Construction ut, please call me Pafford who has plans. Also, Jeff' lities only) as of. would notify Hr..! .Consulting Engineers .... 'SHEET NO. Stemmons Freeway,'Suite .400 - ~Ai, ~:DAI. LAS, TEXAS 75247.- .'-.ii !'.:..: ':* .;:. i'.. ::CHECKED BY ':. x,.: ....... :':~;: ~F7'' :'~ ::~:"-': L::':'.: ..... . .-.... ." .-: :~:,~".~v~ ~' "? .~ ~_ May 25, 1989 Austin Paving Company '" · L.H. Lacy Company PAUL UNZICKER, INC. CONSULTING .ENGINEERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 (214) 634-3300 -i..,' Mario Sinacola & Sons Excavating, Inc. TISEO Paving Company Uvalde Construction Company Re: Meadows Section 6 - Phase One; Coppell, Texas Paving Bids 86062-0 Gentlemen: You are invited to submit a proposal for construction of addition. All labor and materials necessary to complete the enclosed engineering plans and per City of Coppell Standards and included in unit prices. The Owner reserves the right to reject formalities in the bidding procedure. Bids will be received 9, 1989; and should be addressed to: Mr. Gordon Jones DT Construction, Inc. c/o Paul S. Unzicker, Inc. 8700 Stemmons Freeway, Suite 400 Dallas, Texas 75247 Attached is a copy of our estimate of the bid quantities. All under Contract with the Owner and Contractor per Contract Construction staking and grade verification (one time after cc grading by Grading Contractor) will be provided by the Owner Inc. The Owner reserves the right to backcharge the Include in your proposal as separate line items the cost of to the Owner as well as the required maintenance bonds to streets and alley improvements. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bd Enclosure cc: Gordon Jones - DT Construction, Inc. ,Kevin Pieffer - Ginn Engineers facilities in subject work .indicated on the )ecifications, should be or all bids and waive?~ 12:00 noon Friday, is to.be constructed' provided by .him. ~letion ofinitial~site Paul S. Unzicker, for excessive restaking. and performance bonds!. City of Coppell ~or all PAUL S. UNZICKER, RE. President M. SCHNURBUSCH, Vke President DESCRIPTION PAVING BID QUANTITIES MEADOWGLEN SECTION 6-PHASE ONE COPPELL, TEXAS .'for CONS~RUCTION,~NC. 1 2 3 4 5 6 7 8 9 10 ALTERNATE 6" 3500 PSI Reinforced Concrete Pavement :'.'.S 6" 3000 PSI Reinforced Concrete Pavement S 6"-4"-6" 3600 PSI Reinf. Cont. Alley S Lime Stabilized Subgrade S Lime ~ Sawcut and Remove Existing Pavement S Adjust Manholes E. Adjust Cleanouts E. Materials Testing L Payment, Performance and Maintenance Bonds L 4A Cement Stabilized Subgrade S 5A Cement T * Bid items to include all necessary labor, superintendence materials, backfill, compaction, material testing servic and other means of construction required for installation in place) per City of Coppell Standards and Specifications to be in coordination, with all existing as well as future control to be provided and maintained by Contractor throug Y. '-'-~.'--~2,'930 Y. 9,440 .Y. '3,030 ~Y. .16,640 · 225 ,Y. 1,650 ~. 12 S. 1 S. 1 Y. 16,640 4. 225 , equipment, tools, es, final cleanup, of items (comf .Ail constructiOn Ltilities. Traffic aout construction· 8. 9. 10. 11, 12. 13. 14. 15. 16. 17. 18. 19. 20. STORM Sk'W~ PAVING PLAN/PROFILE SAMUEL BLVD (O+00 to 7+00) ' PAVING PLAN/PROFILE SAMUEL BLVD (7+00 to 13+74) PAVING PLAN/PROFILE WOODMOOR DRIVE & ALLEY R PAVING PLAN/PROFILE MARLEE CIRCLE (O+00 to 7+00) AND ALLEY J-2 PAVING PLAN/PROFILE MARLEE CIRCLE (?+00 to 13+Il)AND ALLEY PAVING PLAN/PROFILE ALENDALE DRIVE & ALLEY Q LOT GRADING PLAN LOT GRADING PLAN WATER DETAILS WATER DETAILS SANITARY SEWER DETAILS DRAINAGE DETAILS DRAINAGE DETAILS -2!.- ~--::A__~ D=.=..~LC (DELETED FROM THIS PLAN SET) 22. DRAINAGE DETAILS 23. PAVING DETAILS 24. PAVING DETAILS GINN, INC. C~:~ULTINGI ~IGIIN~ DATE RECEIVED ~-- 2~-~ DME REVIEWED _ [] NO OBJECTIONS ~,MA. CORRECTIONS j~ REVISE & RESUBMIT QATE: ~-O5"--,~ BY: 25. PAVING DETAILS 26. PAVING DETAILS ~~:~Tf~:-~ (DELETED FROM THIS PLAN SET D DOCUMENTS PAUL S. UNZICKER, INC. CONSULTING ENGtNEE,RS a, INC 7.5247 (214) 6 ~3,4 3300