Meadows Addn 6-CS 890525The City Wit, h A Beautiful Future
May 25, 1989
Gordon Jones
DT Construction, Inc.
2221 East Lamar Blvd.
Suite 950 LB 43
Arlington, Texas 76006
RE: Water and Sewer / Meadows Phase 6 Project
Dear Mr. Jones:
Per my conversation with Kevin Kendrick of Unzicker a
I am writing this letter to inform you that there
water/sewer lines within the adjacent area of the pre
Phase 6, which could serve the water and sewer s
proposing for that project. There is an existin¢
Samuel, 20" sewer on Parkway, a 12" water line or
a 10" water line on Samuel.
If you have any questions regarding this matter,
me at 462-8495.
'Howard L. Paffor~
Water Utilities Supervisor
HLP/bb
cc: Steve Goram, Director of Public Works