Loading...
Meadows Addn 6-CS 890509May 9, PAUL $. UNZICKER, INC. 8700 STEMMONS FREEWAY, SUITE 400 ~ dk DALLAS,' TEXAS ~247 ¢214) 6~4-3:~ Mr. Kevin Ginn, Inc. 17 Tex 75248 Re: Meadow~ Coppell :t/on 6 - Phase One .~exas Dear Kevin: The attached F on May 3rd, find below an follows: Plan and Engineering Plans have been revi. )er your review comments found on the return. emized listing of all changes to this plan Sheet 3 of 28~ Water and Sanitary Sewer Plan --Note 10 has been revised to provide a 24-inch clearance and storm sewer inlets --Note 11 has been completed indicating the proper sheet ~ sewer details --Note 13 has been clarified indicating compaction to b. points of optimum moisture --Note 15 has been completed stating water meters to be one curb --Note 23 has been revised stating the contractor shall prov 6" concrete pad for all valves --an additional note (No. 27) has been added indicating thm located one foot within street right-of-way Sheet 4 of 28~ Sanitary Sewer Profiles --Flow line elevations have been added ever 50 feet --a grade of 0.4 percent has been shown between stations 4+38.96 on line "S-I". Sheet 5 of 28; Drainase Area Map --type "B" manholes have been indicated on this exhibit whe~ --positive overflow has been shown on this exhibit in sag a~ --all inlets have been shown as standard recessed inlets PAUL S. UNZICKER, P.E. President ~ed per our meeting ~d markups. Please set. They are as between water mains xmber for water and at ±2 percentage oot behind back of ide 2'-6" x 2'-6" x t sidewalks will be ;+26.41 and station · applicable 'eas AVID M. 5CHNURBUSCH, P.E. Vice President Page 2 Kevin Pieffer May 9, 1989 Sheet 6 of 28~ Storm Sewer Plan & Profile --the hydraulic grade line and elevations have been shown on --a type "B" manhole and the detail location has been shown station 4+10.45 --General Note 3 has been revised indicating 95 percent pavement and 90 percent compaction under natural ground Sheet 7 of 28~ Storm Sewer Plan & Profile --type "B" manholes have been indicated on the exhibit and t has been shown for those manholes at station 8+48.48, sta station 14+71.48 --the hydraulic grade line and elevations have been sho~ section of this exhibit --your request to lower the storm sewer pipe in the vicinit has been investigated. Due to the proposed sanitary sewex and 11+95, th~ grades will remain as is. Lowering the pipe conflict with the proposed Sanitary Sewer Main. However added to each respective Paving Plan/Profile exhibit w contractor of the shallow storm sewer pipe (1.8 foot belov We have also required the use of Class IV RCP pipe where less than 2.0 feet beneath the pavement. Sheet 8 of 28~ Paving Plan and Profiles --top of curb elevations have been added at every 50 foot st~ --General Note 7 has been revised indicating that subgrades than 12 will be lime stabilized and PI's less than stabilized --General Note 10 has been revised to show proctor dens percentage points of optimum moisture --General Note 12 has been revised stating that all pavement thick --an additional note has been added showing location of within street right-of-way) --an additional note has been added indicating that the fls Boulevard were designed by others. As you are aware, provide the necessary grade (minimum allowed per City St Boulevard since one-half the street section is already option is to match these existing grades Sheet 10 of 28~ Paving Plan and Profiles --a note stating contractor shall dowel into existing pavemE of Woodmoor Drive has been added to this exhibit --vertical curve date for the 100 foot curve between Statio~ been added to the profile section of this exhibit. this exhibit for the manhole at compaction under ~e detail locati;n Lion 11+75.79, and m in the profile y of station 12+00 crossings at 8+70 will be in direct , a note has been arming the Paving top of pavement.) the storm sewer is tion with PI's greater 2 will be cement Lties to be at ±2 will be six inches Lde walk (one foot t grades in Samuel we are unable to tndards) in Samuel place. Our only it at the East end 8+50 and 9+50 has Page 3 Kevin Pieffer Nay 9, 1989 Sheet 12; Pavin~ Plan and Profiles --your request to flatten the grades in that reach between station 12+00 has been investigated. It is our engineeri the design sho~n is an acceptable design and will rea~ following reasons: one, reducing the grade through this will generate a steeper grade at the intersection of Mai reducing the site visibility at the intersection substantia the grade through this reach of pavement will cause' grade p East/West streets of this subdivision as well as reducing' to make the subdivision work, and three, the reach of pavel and only 1.5 percent steeper than required by City code respectfully request that this design remain as shown. Sheet 13; Pavin~ Plan and Profiles --a note has been added to this exhibit warning the contrac' storm sewer in the vicinity of station 00+25. TYPe IV RCP specified through this shallow reach. Sheet 14 & 157 Lot Gradin~ Plan --positive overflow areas have been indicated on this exhibit section for the swale has been shown on each lot grading exl If you have any questions regarding this development, please: I appreciate your quick review and approval of this plan set tight schedule to get Samuel Boulevard constructed prior to the 1989-1990 school year. Sincerely, Kevin R. Kendrick, P.E. Project Manager KRK/bd CC: Jeff Hawkins / Pierce Lunsford Associates Gordon Jones / DT Construction station 10+00 and .ng Judgement that in as is for the reach of pavement 'lee and Woodmoor, £1y, two, reducing roblems ~rlthin the :he necessary dirt bent is very short . We therefore, or of the shallow )ipe has also been , A typical cross ~ibit !eel free to call. as we are under a the beginning of