Loading...
Northlake WE P10B-CS 941123 TIPTON ENGINEERING, INC. ENGINEERING . SURVEYING · PLANNING 3936 6330 Belt Line Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946 November 23, 1994 Mr. Larry Davis CITY OF COPPELL 255 Parkway Bird CoppeH, TX 75019 RE: AS BUILTS NORTHLA~ WOODLANDS EAST NO. 10 PHASE "B" COPPELL, TEXAS Dear Mr. Davis: This is your certification that horizontal and vertical control was established for the paving grade and alignment during the time of construction. To our knowledge, the streets and alleys were comtmcted in accordance with the grades and alignment of the control set in the field, which are in accordance with the plans as submitted. If you have any questions or if we can be of any further assistance, please do not hesitate to contact our office. Sincerely, TIFrON ENGINEERING, INC. Richard Hovas, P.E. Vice President Enclosure