Northlake WE P10B-CS 941123 TIPTON ENGINEERING, INC.
ENGINEERING . SURVEYING · PLANNING 3936
6330 Belt Line Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946
November 23, 1994
Mr. Larry Davis
CITY OF COPPELL
255 Parkway Bird
CoppeH, TX 75019
RE: AS BUILTS
NORTHLA~ WOODLANDS EAST NO. 10
PHASE "B"
COPPELL, TEXAS
Dear Mr. Davis:
This is your certification that horizontal and vertical control was established for the paving grade
and alignment during the time of construction. To our knowledge, the streets and alleys were
comtmcted in accordance with the grades and alignment of the control set in the field, which
are in accordance with the plans as submitted.
If you have any questions or if we can be of any further assistance, please do not hesitate to
contact our office.
Sincerely,
TIFrON ENGINEERING, INC.
Richard Hovas, P.E.
Vice President
Enclosure