Loading...
Northlake WE P10B-CS 940914 P.O. Box 478 Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 September 14, 1994 Site Concrete, Inc. Ms. Jean Boney Box 140096 Irving, Texas 75019-0096 RE: Northlake Woodlands 10B Dear Ms. Boney: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, September 10, 1994. The overtime rate including salary and benefits is $29.00 per hour. Four hours were charged to your company on that date. Please send a check for $116.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson If you should have any questions, please contact me at (214) 393-1016. Sincerely, Construction Inspector cc: Finance Department Doug Stevens, Engineering Technician file/ovt.ltr SEP-09~@4 FEI 07:34 P, 02 DATE: September 9, t99a TOt City of Coppall c/o Larry Davis KE: #9417 NorChlake Woodlands JOB# Dear lit. Davis, We are requesting per~ission co work Saturday, 9/10 ,1994 on ~he above mentioned project. Plea$~ sign and re~urn co ~$ by faxin~- To us at 214/513-0825. Thanking you in advance. Site Concrete, nc. APPROVED BY: DATE: