Northlake WE P10B-CS 940228 COPPELL PUBLIC WORKS
Department ~\~ ~
~: Engineering ~
F~M: Public Works Staff ~
~ Douolopm~n~ ~ for ~or~l~o ~oodlan~
The following fees have been revised due the to changes made by
Planning and Zoning and should be assessed and collected on the above
referenced project.
Water I. pact Fee: ~ %'\~--'
89 - 5/8" X 3/4" Domestic Meter/s = 89 ESU's--~~
- Not Available Irrigation Meter/s = ESU's '~
N/A - Fireline Meter/s = ESU's
Total 89 ESU's @ $650.00 ea = $ 57,850.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
N/A - Domestic Meter/s = ESU's
Total ESU's ~ $225.00 ea = $
100% due prior to Council approval of final plat.
Wastewater Impact (City)
89 - 5/8" x 3/4" Domestic Meter/s = 89 ESU's
Total 89 ESU's @ $450.00 ea = $ 40,050.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
89 Connections @ $100.00 each = $ 8,900.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
PageDeVel°pment2 Fees
Sewer Tap Inspection Fee
89 Connections ~ $100.00 each = 5 So900.00
100% due prior to issuance of building permit. (Residential only)
Utility Final Inspection Fee (All Development)
89 lots @ S50.00/lot = $ 4.450.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
89 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 1,980.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
- Not Available Irrigation Meter/s @ $ ea = 5
N/A - Fireline Meter/s @ $ ea = $
100% due prior to issuance of water meter/s.
Water MeterDeposit (Residential)
89 Meters ~ 530.00 ea = $ 1,980.25
100% due prior to issuance of building permit.
Water MeterDeposit (Multi-Family or Non-Residential)
N/A Meters
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Not Available Meters ~ 535.00 ea = 5
100% due prior to issuance of water meters.
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
89 Residential Lots at $150.00 each = S 13,350.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official
Developmentpage 5 Fees
STREET SIGN ASSESSMENT
for Northlake Woodlands East 10B
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
$IGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 18 S1,143.72
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 7 677.95
OTHER
No Outlet 30" 65.12 2' 130.24
TOTAL $1,951.91
NLWDEAST.IOB Revised 1/14/94