Loading...
Northlake 635(3)-LR 98041604/29/95 09:28 FAX 21465070?0 RBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 04/0711998 Client No.: 52617000 Client: Lincoln Property Compm]y 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9809120 Project No.: 43-2452, Project: Coppell Belt Lin, Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requb compressive strength samples.** SLUMP: AIR: TEST METIIOD: co~r~cToR: Butler ConstructiOn CONCRETE SUPPLIER: Pioneer Concrete Pcn~r: 22 SPECIFI~TION REQUIREME~S STRENGTll; 4000 psi ~ 28 Days 5" N/A ASTM C-143 AS~ C-172 ASTM C-39 PROJECT DATA CONCRI~TF, CLASS: 9351 et,nc~t.f~rr O,T~: 04/07/1998 TIME SAMPLED: 12:55 pm BY: WEATHER CONDITIONS; $ uuny TEMI~ERATUR£(F)-AIR 79 F TRUCKNO: 552 TtCKI ~,m con'rwvr (%): N/A PLACIgM~'NT LOCATION: SAMPLE LOCATION: 50'N/SfaC, 20' west CYLINDER MARKED SET NO. REPORT OF TESTS MEASURED MAXIMUM SLUMP OATE AGE lOAD (incite.) TESTED (da}l) 0b$. force) 2 1 5.00 04/14/1998 7 80850 2 2 5.00 04/14/1998 7 76610 Average 5.00 05/05/I998 28 5.00 05/05/1998 28 A4 This report is e.xclusivety Iht thc usc of thc client indicatc~ above and shall not b~ r~p~oducr~ except in full wl'dlou~ the, Page 2 of 3 ~ 003/004 8901 Carpenter FrwT. SeRe #100 DMIM, Texas 752a7 Report Date 04/16/1998 ,97 lusiness Center 1I Rd. & Lakeshore Dr. Texas field test and cast aATCHT~ME: 12:25 pm )amon Elrod ONCRETE: 84 640304 WEIGHT (tact): N/A CUMULATIVE YARDS: COM?R~lVE 5TRF~qGTH (psi) 2710 2790 160 TYPE rltten approval of HBC Engineering. Inc. Texas Comr[, _.sion on. Fire Protection P.O. Box 2286, Austin, Texas 78768-2286 (512) 918-7100 CONTRACTOR'8 MATERIAL & ~ CERTIFICATE FOR U NDE~ PLANS LO~T[ON umzutmmoND PIPES AND dOINTS TEST DET)CRIPTION INSTALLATION CONF~ TO .ACCEvmcu PLANS EQUIPMENT USED IS APPROVED Z~ ND, STATE DEVIATIONS: HAS PERSON IN 'cHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF COfflliOL VALVES AND CARE AND MAINTENANCE OF THIS NEi/ EQUIPMENT' IF NOt EXPLAIN IN REHARKS SEC¥iON HAVE COPIES OF, APPROPRIATE, INSTRUCTIOii$ AND CARE AND MAIN/i:sANCE CHARTS ,BtTJI LEFT ON PREMISES IF NO, EXPLAIN IN REMARKS SECTION SUPPLIES BUILDINGS LISTE~ *A~OVE PVC CLASS !50 SLIP PIPE CONFORMS TO NFPA STANDARD FITTINGS CONFORM TO NFPA STANDARD XF NO, EXPLAIN ZN ~EHARKS SECTION OOZNTS NEEDING ANCHORAGE CLAHPED, STRAPPED, OR BLOCK(O IN ACCORDANCE tilTH NFPA STANDARD IF NO, EXPLAIN IN RLT.~ARKS SECTION '* FLUSHING. fi'ow the required rate until water is clear as indicated by no col In burlap bags at outlets such as hydrants and blow-offs. Flush at flo~s not L mtn for 4-tnch pipe, 600 GPM (2271 L/mtn) for 5-tnch pipe, 760 GPM (2839 L / ) ' - ' mia for lO-lnch'ptpe' and GPM 3785 L/mtn) for .8~tnch pipe, 1500. GPM .(S. 67.8 .L/_ ..) ............ ,. -t~ch piPe, When supply cannot p~oouce 1H~DROSTAYIC. Hydrestattc test shall be .mae ac noc :ess cnan 3 4 pars) above static pressure in excess of 150 pst (10.3 bsrs) for twa hou ( ' ' sketed otnts shall, tf the NorbB~nshtp (1.89 L/h) per 100 3o~n~s ~rrespec~ve_ o- Joints. If such leakage Occurs at a te~ jo~n~s ~ne ~ns~alla~on sna~ ue cu~ necessary repairs made. The amount of allowable leakage specified above may per in. valve diameter per hour (30 mL/25 ,Tn/h) for each metal*seated valve If dry barrel hydrants are tested ~tth the main valve open, so the hydrants dtttonal S oz per minute (150 mL/mtn) leakage is permitted for eagh hydrant. NEW UNDERGROUND PIPING FLUSHED ACCORDING TO ~FPA ST"U-nARD BY (COMPANY) IF NO, EXPLAIN IN REHARKS SECTION H~ FLUSHING FLOW WAS OBTAINED XpUBLIC #ATE~ TANK OR RESERVOIR LEAD-INS FLUSHED ACCORDING TO NFPA BY(COMPANY) IF NO, EXPLAIN IN REHARKS SECTION FIRE PUMP STANDARD THROUGH MHAT HYDRANT BU · I THROUGH ~HAT __FIRE PUMP~ HOW FLUSHING FLOW WAS OBTAINED XPUBLIC WATER ___TANK OR RESERVOIR Fora 856 ',GROUND PIPING '-: ' CITY STATE ZIP · ~.YES NO .~_yES ~ X ;YES _g_YES __NO 'X YES NO X_.YES .__KO lectton of foreign materia 'less than 400 GPH (1514 rmtn) for 6-tnch'pfpe, 1000' ~000 GPM(7570 L/mtn) for m available. ~rs) for two hours or 50psi rs. is satisfactory, have not exceed 2 qts. per hr.- distributed over all idered unsa:tsfactory and · increased by 1 fl oz solating the test section: re under pressure,, an ad- X YES .__.NO 'YPE OPENING X oPEN PIPE X YES NO 'YPE OPENING 'LANGE & SPIGOT X__OPEN PIPE HYDROSTAtiC TEST YALYES TES'~ YFIllESSED BY: ALL NEN UNDERGROUND PIPING.HYDROSTATICALLY TESTED AT FOR ~ HOURS TOTAL AMOUNT OF' LEAKAGE MEASURED GALS HOURS ALLOIMBLE LEAKAGE GALS HOURS NUHBER TNSTALLED TYPE AND RAKE NATER CONTROL VALVES LEFT #ZDE OPEN IF NO~ STATE REASON HOSE THREADS OF FIRE DEPARTHENT CONNECTIONS AND,HYDRANTS ZNTER- CllANGEABLE I/ZTH THOSE OF FIRE DEPARlgENT ANSYERING ALAI~ DATE LEFT IN SERVICE ALL OPERATE SATISFACTORILY X__YES Upon completion of work, Inspection end.tests, shall be made by the contract~ nessed by an mmer's rePresentative. All defects shall be corrected and sy,, contractor's personnel f~nally'1eeve the Job. A certificate shall be f~11ed out and stgned by both representatives. proving authorities, miners, contractors, and the Sta.te. Ftre .Marshal. It t: representettve's signature tn no Way Pre;iudtcesJ~y Clam* against contractor wor'manshtp, or fatlure to cmply ~th/~pprov~-ii~thor,~ty.'s requ~,mmflts I CERTIFY THAT THE INFORHATION HEREIN IS TRUE AND THAT THIS SPRINKLER 'SYSTE~ NAS INSTALLED ll~ ACCOI~ ANCE #ITH ARTICLE 5.43-3, TEXAS INSURANCE CODE.AND THE RULES ADOPTED BY THEISTATE BOARD .OF* INSURANCE AS AlX4INZSTERED BY THE STATE FIRE HARSHAL. ,r's representettve and wit- ,tea left in service before ,s shall be prepared for 'ap- understood the owoer's for faulty materiel, poor local ordinances. RESPONSIBLE HARAGING EHPLOYEE [SIGNATURE) ,/~ ~(/--4~rC~' R.~4. E. LTCERSE # 0069 ' [ DA~E j ' . D1 stri butlon: 85-B BACK Ortginal Copy posted at site. Copy 4 for State Fire Marshal. Copy 2 for Installing Company. Copy 3 for A Jthortty having Jurisdiction. 04/29/98 09:28 FAX 2146307070 HBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 04/07/1998 Report No.: 9809120 Client No.: 52617000 Project No.: 43-2452- Client: Lincoln Propez~y Company 3300 Lincoln Plaz, a/Lan-y Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppeil Belt Lin, Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples.** 004/004 $901 Carpcmcr Frwy., Suite #100 Olllu, Tczis '~S24'~ Report Date 04/16/1998 97 3usiness Center Il ~ Rd. & Lakeshore Dr. Texas field test and east PROJECT DATA co~'rancroR: Butler Construction CONCg~ Ct.ASS: 935 I CONCRETE SUPPLIER: Pioneer Concrete e~cg~ DATE, 04/07/1998 e~'z': 22 ~M~S~O: 2:55 pm ~v: E SPgCIF~CAT~ON REQUIREME~S W~A~R co~m~ S~By, · a~REsa~: 4000 psi ~ 28 Days ~~~.~m 81 v c SLUMP: 5" ~UCK NO: 853 ~C~ AIR: N/A A~ CO~ (%): N/A UN ~ ~ET.O0: ASTM C- 143 e~cE~ L~On: ~p~ I ASTM C- 172 ASTM C-39 ,~&MPLE LOCATION: 80'N/SEC, 15' in, west REPORT OF TESTS CYLIND£R MEASURED MAXIMUM MARKF, D SLUMP DATir- AGE LOAD SET' NO. (inches) 'rESTED (days) Obs. l'erce) 3 I 4.50 04/14/1998 7 !02620 3 2 4.50 04/14/1998 7 981 O0 Average 3 3 4.50 05/05/I998 28 3 4 4.50 05/05/1998 28 A( BATCHTIME: 2:20 pm amen Elrod dndy T NO: 640324 T WEIGHT (pcO: N/A :~~v~ rares: 260 36~0 3470 ~550 TYPE Technician: Damon Elrod Report Distribution: (1) Lincoln Property Company (I) Butler Coasttuction (I) O'l~tien & Associates (I) AECC, lnc, Started: 9:00 am (1) City ol'Coppcll/~ldgr imp. (l) City ofCoppefl/Constt, ln~p. Finished: 4:30 am This rcpor~ is exclusively for thc use of :he client indicated above ~d sh~ll not be reproduced excep~ in full wRhout Ihe ,a Vice President rRle~ approval of ['iBC Engineering, Inc. 01AK Page 3 of 3 04/29/98 09:27 FAX 2146307070 I-IBC ENGINEERING CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 04/07/1998 Client No.: 52617000 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 9809120 Project No.: 43-2452. Project: Coppel! Belt Lin Coppe[l, Services: Obtain samples &fresh concrete at the placement locations, perform recluix compressive strength samples.** cOr~TmkCTOm Butler Construction CONCRETE SUPPLIER: Pioneer Concrete Pr. aN1': 22 SPECIFICATION REQUIREMENTS STRF~CTi~: 4000 psi ~ 28 Days SLUMP: 5" AIR: N/A T~.~T METHOV: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 pLAC~E~rr OAT~: 04/07/1998 TIM~SA~eLEO: 1].:05 am aY: I WZA~ co~mo~s: Su~y ~~~-~ 78 ~ ( TRUCK NO: 512 TlC~ P~CE~ ~ON: Pavement b~t~n Buil~in~ A ~ C SAMPLE LOCATION: 20'N/SEC. 10' in, west CYLINDER MARKED SET NO. REPORT OF TESTS MEASUR~',D MAXIMUM SLUMP DATE AG E LOAD (inch.) TESTED (days) (lbs. force) I 1 5.00 04/14/1998 7 94010 ! 2 5.00 04/14/1998 7 89670 Average 5.00 05/0511998 28 $.00 05/05/1998 28 This report is exclusively tbr thc usc or,he ctieat i~dicated above and shall not be ~produced except in full without ~c' 0IAK Page I of 3 002/004 ENGINEERING, INC.. ~901 Carpenter Frwy., Suite #10O Repor~ Date 04/16/1998 ,97 Business Center II ~ Rd. & Lakeshore Dr, Texas ed field test and cast BATCHTI[ME: 10:50 am ~amon Eh'Od ~TNO; 640288 rwna~r¢~0:N/A CUMULATIVE YARDS: 60 COMP~ESSlV~ STRENGTH (p~) 3320 3170 3250 TY~E ~t~cn approval of tlBC Engineering. inc. REPORT OF DRILLE r"PIER INSPECTION Date of Service: Client No.: Client: 03/31/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980856z Project No.: 43-2452 Project: Coppell Belt Lin, Coppell, Services: Drilled pier inspection On this date, an HBC Engineering technician arrived at jobsite as scheduled. Drilling was cancelled for this conditions. the above ref~ date due to wi Technician time: 6:30 am to 8:30 am 8901 Carpenter Frwy., Suit~ #100 Dallas, Texm 75247 ,97 Report Date 04/16/1998 ]usiness Center II , Rd. & Lakeshore Dr. Texas ~renced ~t Technician: Brian Otis RepoFt Distribution: (1) Lincoln Prop~ty C~mpmy (1) Butl~ Cemauctica (1) O'Brien & Amocia~ (1) AECC, Inc. O) City ,~'co~k~. mm. O) city ~ co~e~'c.m~, mm. I-~ En~mg, Pa Se~ This report is e~clusively fcr the use ~fthe client indicated above md ~al! not be reproduced except in full without the writter ,I D. Smith, P.E. ior Project Engineer approval of HBC Engineering./a~ 99MP Page I of 1 "CONCRETE COMPI SIVE STRENGTH TE " '2 Date of Service: 04/07/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 980912¢ 43-2452 Coppell Belt Lin Coppell Services: Obtain samples of fresh concrete at the placement locations, perform requi~ compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 04/07/1998 TIME SAMPLED: 11:05 am BY: WEATHER CONDITIONS: Sunny TEMPERATURE (F) - AIR 78 F TRUCK NO: 512 TICI~ AIR CONTENT (%): N/A UN PLACEMENT LOCATION: Pavement between Buildings A & C SAMPLE LOCATION: 20'N/SEC, 10' in, west REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.00 04/14/1998 1 2 5.00 04/14/1998 MAXIMUM AGE LOAD (days) (lbs. force) 7 94010 7 89670 Average I 3 5.00 05/05/1998 28 I 4 5.00 05/05/1998 28 AC This report is exclusively tbr thc use of the client indicated above and shall not be reproduced except in full without the wri 01AK Page I of 3 .97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/16/1998 Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast BATCH TIME: 10:50 am ~amon Elrod DNCRETE: 80 F TNO: 640288 TWEIGHT(pc0: N/A CUMULATIVE YARDS: 60 UOMPRESSIVE STRENGTH (psi) 3320 3170 3250 FRACTURE TYPE ten approval of HBC Engineering, Inc. · 'CONCRETE Date of Service: Client No.: Client: Services: SLUMP: AIR: TEST METHOD: COMPRESSIVE STRENGTH 04/07/1998 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Report No.: 980912 Project No.: 43-245: Project: Coppell Belt Lil Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples.** CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA Butler Construction CONCRETE CLASS: 9351 Pioneer Concrete PLACEMENT OATE: 04/07/1998 22 SAMPLE LOCATION: 50'N/SEC, 20' west CYLINDER MARKED SET NO. .97 ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/16/1998 Business Center II te Rd. & Lakeshore Dr. Texas 'ed field test and cast BATCH TIME: 12:25 pm TIME SAMPLED: 12:55 pm aY: pamon Elrod WEATHER CONDITIONS: Sunny l TEMPERATURE (F) - AIR 79 F (~ONCRETE: 84 F TRUCKNO: 552 TICK~TNO: 640304 AIR CONTENT (%): N/A ur PLACEMENT LOCATION: See page I REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) IT WEIGHT (PC0: N/A 2CUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 2860 2710 2790 2 1 5.00 04/14/1998 7 80850 2 2 5.00 04/14/1998 7 76610 Average 2 3 5.00 05/05/1998 28 2 4 5.00 05/05/1998 28 report is exclusively tbr the usc of the client indicated above and shall not be reproduced except in full without the ~ 160 FRACTURE TYPE [ttcn approval of HBC Engineering, Inc. 01AK Page 2 of 3 CONCRETE COMPR SIVE STRENGTH Date of ServiCe: 04/07/1998 Report No.: Client No.: 52617000 Project No.: 980912~ 43-2452 .97 ENGINEERING, llxl2. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 04/16/1998 Client: Services: SLUMP: AIR: TEST METHOD: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Belt Lin Coppel[ Obtain sami~les of fresh concrete at the placement locations, perform requit compressive strength samples.** CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 80'N/SEC, 15' in, west CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 I 4.50 3 2 4.50 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 04/07/1998 TIME SAMPLED: 2:55 pm BY: [' Business Center II e Rd. & Lakeshore Dr. Texas ed field test and cast WEATHER CONDITIONS: Sunny, v TEMPERATURE (F) - AIR 81 F C TRUCK NO: 853 TICKE AIR CONTENT (%): N/A UN~ PLACEMENT LOCATION: See page 1 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 04/14/1998 7 102620 04/14/1998 7 98100 Average BATCH TIME: 2:20 pm ~amon Elrod rindy )NCRETE: 88 F r NO: 640324 T WEIG~rr (pc0: N/A 3 3 4.50 05/05/1998 28 3 4 4.50 05/05/1998 28 AC Technician: Damon Elrod Started: 9:00 am Finished: 4:30 am ~ Report Distribution: (I) Lincoln Property Company (I) City ofCoppell/BIdg, lnsp. (i) Butler Construction ( I ) City of Coppell/Constr. Insp. l~ ( I ) O'Brien & Associates (I) AECC, Inc. This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in full without thc writ 01AK Page 3 of 3 CUMULATIVE YARDS: 260 2OMPRESSIVE STRENGTH (psi) 363O 347O 3550 FRA~URE TYPE Engin~ ugene Harbour Vice President en approval of HBC Engineering, Inc.