Northlake 635(3)-LR 980422 (2)CONCRETE COMPI.~_,SSNE STRENGTH TEST
ENGINEERIIVG, INC.
8901 Carpenter Frwy., Suite N(00
Dallas, Texas 75247
Date of Service: 03/24/1998 Report No.: 980803 Report Date
04/22/ 1998
Client No.: $2617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
$00 North Akard Street
Dallas TX 7$201-3394
Project No.: 43-24$
Project: Coppel Business Center II
Belt Li a Rd. & Lakeshore Dr.
Coppel Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000.psi @ 28 Days
SLUMP: $"
A[R: N/A
TEST METHOD: ASTM C-143
ASTM C-143
ASTM C-39
SAMPLE LOCATION: 4 line between B and C
CYLWDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 1 7.00
1 2 7.00
1 3 7.00
1 4 7.00
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/ 1998
TIME SAMPLED: 8:30 am BY: I
WEATHER CONDITIONS: CIeaC an
TEMPERATURE (F) -AIR 69 F c
TRUCK NO: 823 TICKI
A[R CONTENT (•/.>: N/A UN
PLACEMENT LOCATION:
Slab on grade, building B
REPORT OF TESTS
03/31/1998
03/31/1998
04/21/1998
04/21/1998
NOTE: Concrete placed by pump truck.
Technician did not monitor this pour.
used. Technician made cylinders only.
MAXIMUM
ACE LOAD
(days) (Ibs. force)
7 97170
7 91030
Average
28 122260
28 12$940
Average
All samples taken from point c
Contractor controlled water ar
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
field test and cast
BATCH TIME: 7:30 am
ian Otis
mild
VCRETE: 7I F
No: 664568
WEIGHT (pcf): N/A
STRENGTH
(psi)
3440
3220
3330
4320
44$0
4390
f deposit.
d slump
YARDS: 28O
FRACTURE
TYPE
approval of HBC Engineering, Inc.
OIMP Page (of3
i''~ ~
CONCRETE COMPRESSIVE STRENGTH TEST
ENGIIVEERING,INC.
8901 Carpenter Fnvy., Suite 11100
Dallas. Texas 75247
Date of Service: 03/24/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 7520.1-3394
Report No.: 980803 Report Date
04/22/ 1998
Project No.: 43-245-97
Project: Coppell Business Center II
Belt Li a Rd. & Lakeshore Dr.
Coppell Texas
Services: Obtain samples of fresh concrete at the placement locations, perform
compressive strength samples.**
PROJECT DATA
coNTRACroR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 pS1 @ 28 Days
SLUMP: S"
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-143
ASTM C-39
SAMPLE LOCATION: 7 line between A and B
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
2 1 6.00
2 2 6.00
2 3 6.00
2 4 6.00
See Note page 1.
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/1998
TIME SAMPLED: 10:19 am BY: ):
1'VEATHER CONDITIONS: Clear an
.TEMPERATURE (F) -AIR 71 F C
TRUCK NO: 407 TICKI
A[R CONTENT (°/.>: N/A uN
PLACEMENT LOCATION:
See Page 1
REPORT OF TESTS
MAXIMUM
DATE AGE LOAD
TESTED (days) (Ibs. force)
03/31/1998 7 105040
03/31 / 1998 7 99790
Average
04/21/1998 28 113620
04/21/1998 28 113390
Average
field test and cast
BATCH TIME: 9:34 am
rian Otis
1 warm
JNCRETE: 7O F
r No: 664591
T WEIGHT (pct): NIA
STRENGTH
(psi)
3710
3530
3620
4020
4010
4020
YARDS: 430
FRACTURE
TYPE
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
approval of HBC Engineering, lnc.
OtNlr Page 2 of 3
r1,
CONCRETE COMPR~~t~SIVE STRENGTH TE~~T
Started: N/A
Date of Service: 03/24/1998
Client No.: $2617000
Client: Lincoln Propertyy Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 7$201-3394
(i) City ofCoppell/Bldg. Insp.
(I) City ofCoppell/Constr. Insp.
Services: Obtain samples of fresh concrete at the placement locations, perform
compressive strength samples.**
PROJECT DATA
Project: Coppell Business Center I[
Belt Li a Rd. & Lakeshore Dr.
Coppell Texas
CONTRACTOR: Butler Construction CONCRETE CLASS: 9349
CONCRETE SUPPLIER: Pioneer COncfete PLACEMENT DATE: 03/24/1998 BATCH T[ME: 11:07 am
PLANT: 27 TIME SAMPLED: 12:30 pm BY: rian Otis
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cleat an Warm
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) -AIR 84 F C NCRETE: 73 F
SLUMP: $" TRUCK NO: 826 T[CK No: 664611
AIR: N/A AIR CONTENT (•/.): N/A UN T WEIGHT (pct): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
ASTM C-143 See Page I
ASTM C-39
SAMPLE LOCATION: 9 line between B and C
REPORT OF TESTS
CYLINDER
MARKED
SET 1V0.
3 1
3 2
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (Ibs. farce)
7.50
7.50
3 3 7.50
3 4 7.50
See Note on Page 1.
Technician: Brian Otis
Report Distribution:
(I) Lincoln Property Company
(I) Butler Construction
(I) O'Brien & Associates
(1) AECC, Inc.
106870
105730
Average
122660
119380
Average
time.
Finished: N/A
ENGQVF.ERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75217
field test and cast
.TINE YARDS: 860
STRENGTH
(Psi)
3780
3740
3760
4340
4220
4280
FRACTURE
TYPE
Engi~~nc.
Vice President
This report is exclusively for tl~e use of the client indicated above and shall not be reproduced except in full without the
03/31/1998 7
03/31/1998 7
04/21 / 1998 28
04/21/1998 28
See Report 9808018 for technician
Report No.: 980803 Report Date
04/22/1998
Project No.: 43-245 -97
approval of HBC Engineering, Inc.
O1MP Pagc 3 of3
~"\
C~JIVCRETE COMPR~.~SIVE STRENGTH TES T
ENGIIVEERWG, INC.
8901 Cstrpentcr Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/14/1998 Report No.: 980972 Report Date
04/22/1998
Client No.: 52617000 Project No.: 43-245
Client: Lincoln Property Company Project: Coppell
3300 Lincoln Plaza/Larry Moon Belt Lin
500 North Akard Street
Dallas TX 75201-3394 Coppell
Services: Obtain samples of fresh concrete at the placement locations, perform requii
compressive strength samples.**
PROJECT DATA
coNTRACTOa: Butler Construction
CONCRETESUI'PLIER: PlOneerCOncrete
PLANT: l 6
SPECIFICATION REQUIREMEN"CS
STRENGTH: 4000 pSi @ 28 Days
SLUMP: S"
AIR: 3-6%
TESTi17ETHOD: ASTMC-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: G.~, 9.2~
CONCRETE CLASS: 9349
PLACEMENT DATE: O4/ 14/ 1998
TIME SAMPLED: 7:20 aln BY: l
WEATHERCONDITIONS: ClOUdy,
TEMPERATURE (F) -AIR 7O F
TRUCK NO: 731 TICKI
A[R CONTENT (%): N/A U>`
PLACEMENT LOCATION:
Building D slab, A & B line, column lines 1-',
REPORT OF TESTS
CYLINDER ~1EASURED
MARKED SLUi11P DATE
SET NO. (incltcs) TESTED
1 1 5.00 04/21/1998
1 2 5.00 04/21/1998
1 3
1 4
MAXIMUM
AGE LOAD
(days) (Ibs.force)
7 101490
7 94850
Average
5.00 05/12/1998 28
5.00 05/12/1998 28
3usiness Center II
Rd. & Lakeshore Dr.
Texas
field test and cast
BATCH TIME: 7:1 O am
ie Elrod
DNCRETE: 78 F
T No: 702332
T WEIGHT (pcQ: N/A
f; and A-H line, column lines 9-1
YARDS: 60
STRENGTH
(Psi)
FRACTURE
TYPE
3590
3350
3470
phis report is exclusively for the use of the client indicated above and shalt not be reproduced except in full without die
approval of HBC Engineering, Inc.
OIAK Page (of 7
~ ,,~
•' CONCRETE COMPRL,~SIVE STRENGTH TEST
ENGIIVEERING, INC.
8901 Carpcatcr Frwy., Suitc fI10(1
Dallas, Tcxas 75247
Date of Service: 04/14/1998 Report No.: 980972 Report Date
04/22/ 1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Ptaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project No.: 43-245 -97
Project: Coppell Business Center II
Belt Lit Rd. & Lakeshore Dr.
Coppell Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requii
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 pSl @ 28 Days
SLUMP: S ~~
AIR: 3-6%
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: P.25, 9.25
colvcRETE CLASS: 9349
PLACEMENT DATE: O4/ 14/ 1998
TIME SAMPLED: 8: I S am BY: I
WEATHER CONDrriONS: CIOUdy,
TEMPERATURE (F) - A[R 69 F
TRUCK NO: 728 TICK]
AIR CONTENT (%): N/A un
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (Ibs. force)
2 1 5.25 04/21/1998 7 116590
2 2 S.2S 04/21/1998 7 113650
Average
2 3 5.25 05/12/1998 28
2 4 5.25 05/12/1998 28
field test and cast
BATCH TIME: 8:08 am
ddie Elrod
;ool
)NCRETE: 7S F
r No: 702340
T W EIGHT (pcf): N/A
'CUMULATIVE YARDS: 140
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4120
4020
4070
-0'
'Phis report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrf tten approval of HBC Engineering, Inc.
OIAK Pagc 2 of 7
. ~
CONCRETE COMP~SSIVE STRENGTH TEST
ENGIIVEERING, INC.
8)Ul Carpenter Frwy., Suite #IUU
Dallas, Texas 75247
Date of Service: 04/14/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980972 Report Date
04/22/ 1998
Project No.: 43-245 -97
Project: Coppel Business Center II
Belt Li a Rd. & Lakeshore Dr.
Coppel ,Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requi~ed field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: PIO11eeC CORCrete
PLANT: I6
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 pSl @ 28 Days
SLU~~IP: S~~
A[R: 3-6%
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: ES, 9.25
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/14/199 BATCH TIME: 8:42 am
TIME SAMPLED: 8:45 am BY: ddie Elrod
WEATHER CONDITIONS: CIOUdy, COOI
TEMPERATURE (F) - A[R 7O F ONCRETE: 76 F
TRUCK NO: 1806 TIC T NO: 702346
AIR CONTENT (%): N/A U IT WEIGHT (pcO: N/A
PLACEMENT LOCAT[ON:
See page I
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP UA7'E AGE
SET NO. (inches) TESTED (days)
3 1 5.25 04/21/1998 7
3 2 5.25 04/21/1998 7
3 3 5.25 05/12/1998 28
3 4 5.25 05/12/1998 28
MAXIMUM
LOAD
(Ibs. force)
yy~~~
97870
Average
:CUMULATIVE YARDS: 200
COMPRESSIVE
STRENGTH FRACTURE
(Psi) TYPE
3500
3460
3480
a'
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
approval of HBC Engineering, [nc.
OI:U: 1'agc 3 of 7
~.
CONCRETE COMP~,~SIVE STRENGTH TE~~T
ENGII~IEERING, INC.
8')OI Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/ 14/ 1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Report No.: 980972 Report Date
04/22/ 1998
Project No.: 43-245 -97
Project: Coppell Business Center tI
Belt Li Rd. & Lakeshore Dr.
Coppell Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler CO11StruCtlOt1
CONCRETE SUPPLIER: PlOneer COIICrete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: $"
AIR: 3-6%
TEST METI{OD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: C.S, 9.5
CYLINDER
MARKED
SET NO.
4 1
4 2
4 3
4 4
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/14/1998
TIME SAMPLED: 1 1:20 am BY: I
WEATHER CONDITIONS: Partly cl
TEMPERATURE (F) -AIR 78 F C
TRUCK NO: 6S4 TICKI
A[R CONTENT (%): NIA uN
PLACEMENT LOCATION:
See page I
REPORT OF TESTS
117 EASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (Ibs. force)
5.50 04/21/1998 7 85460
S.SO 04/21/1998 7 88170
Average
5.50 05/12/1998 28
S.SO 05/12/1998 28
field test and cast
BATCH TIME: 10:35 am
ddie Elrod
Judy, warm
)NCRETE: 79 F
r No: 702363
TWEIGHT(pcf): N/A
T[VE YARDS: 370
STRENGTH
(Psi)
3020
3120
3070
FRACTURE
TYPE
a'
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
n approval of HBC Engineering, Inc.
OIAK Pagc 4 of 7
~;
CONCRETE COMPR~aSIVE STRENGTH TEa I'
ENGINEERING, INC.
8901 Carpenter Fnvy., Suite #1(10
Dallas, Texxs 75247
Date of Service: 04/ 14/ l 998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 Nortli Akard Street
Dallas TX 75201-3394
MAXIMUM
AGE LOAD
(days) (Ibs. force)
Services: Obtain samples of fresh concrete at the placement locations, perform requ
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: PlOneeC COI1CCete
PLANT: 16
SPECIFICATION REQUIREMENTS
STRENGTH: 4000.pSI @ 28 Days
SLUMP: S"
A[R: 3-G%
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A.7~, 10.5
CONCRETE CLASS: 9349
PLACEMENT DATE: 04/14/1998
TIME SAMPLED: 12:45 pm BY: )-
WEATHER CONDITIONS: Partly CI
TEMPERATURE (F) -AIR 82 F C
TRUCK NO: 6S4 TICKF
AIR CONTENT (%): N/A UN
PLACEMENT LOCATION:
See page t
REPORT OF TESTS
CYLINDER 114EASURED
i\1ARKED SLUMP DATE
SET NO. (inches) TESTED
S 1 5.00 04/21/1998
S 2 5.00 04/21/1998
Report No.:
Project No.: 43
Report Date
04/22/1998
Project: Coppell Business Center II
Belt Li e Rd. & Lakeshore Dr.
Coppell Texas
7 125920
7 116190
Average
S 3 5.00 05/12/1998 28
S 4 5.00 05/12/1998 28
field test and cast
BATCH TIME: 1 1:48 am
ddie Elrod
Ludy, warm
)NCRETE: 79 F
rNO: 702373
t WEIGHT (pct): N/A
.TINE YARDS: 470
STRENGTH
(Psi)
4450
4110
4280
FRACTURE
TYPE
"this report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
approval of HBC Engineering, Inc.
OiAK Pagc 5 of 7
CONCRETE COMPR~SIVE STRENGTH TES
ENGINEERING, INC.
8)Ol Carpenter Frwy., Suite ft100
Dallas, Texas 7i2J7
Date of Service: 04/14/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akal-d Stl'eet
Dallas TX 75201-3394
1~epVrt L'dlC
Report No.: 9809724 04/22/1998
Project No.: 43-2452 97
Project: Coppell Business Center II
Belt Lin Rd. & Lakeshore Dr.
Coppell Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requi ed field test and cast
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler COriStCUChOn
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 16
SPECIFICATION REQUIREIV[ENTS
STRENGTH: 4000 pSl @ 28 Days
SLUMP: $~~
AtR: 3-6%
TEST NIETIiOD: A$TM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A.75, 8.7~
CONCRETE CLASS: 9349
PLACEMENT DATE: O4/ 14/ 199
TIME SAMPLED: 1:40 pm BY:
WEATHER CONDITIONS: Partly
TEMPERATURE (F) -AIR 83 F
'TRUCK NO: 739 TIC
AIR CONTENT (%): NIA I
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
6 1 5.00 04/21/1998
6 2 5.00 04/21 / 1998
6 3 5.00 05/12/1998
6 4 5.00 05/12/1998
MAXIMUM
AGE LOAD
(days) (Ibs. force)
7 114780
7 111100
Average
28
28
BATCH TIME: NIA
iie Elrod
dy, warm
dCRETE: 78 F
No: 702379
WEIGHT (pcf): N/A
~CCUI\IULATIVE YARDS: S3O
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
4060
3930
4000
'this report is exclusively for the use of the client indicated above and shall not be reproduced except in full without th~ written approval of HBC Engineering, Inc.
Page 6 of 7
Ol AK
- CONCRETE COMPR~.~SIVE STRENGTH TE ~
PROJECT DATA
CONCRETE CLASS: 9349
Date of Service: 04/14/1998 Report No.: 980972 Report Date
04/22/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project No.: 43-245 -97
Project: Coppell Business Center II
Belt Lin Rd. & Lakeshore Dr.
Coppell Texas
Services: Obtain samples of fi-esh concrete at the placement locations, perform requil
compressive strength samples.**
CONTRACTOR: Butler Construction
CONCRETE SUPPLER: Pioneer Concrete
PLANT: 16
SPECIFICA"TION REQII[REh1ENT5
STRENGTI-L• 4000 pSl @ 28 Days
SLUMP: 5"
AIR: 3-6%
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A.75, 3.5
ENGINEERING, [NC.
8901 Carpenter Frwy., Suite NIUO
Dallas, Texas 752J7
field test and cast
PLACEMENT DATE: 04/14/1998 BATCH TIME: 2:55 pm
TIME SAMPLED: 3:20 pm BY: ddie Elrod
W FATHER CONDITIONS: Partly CI udy, warm
"TEMPERATURE {F) -AIR 84 F C NCRETE: 77 F
TRUCK NO: 731 TICK No: 702391
A[R CONTENT (%): N/A UN T WEIGHT (pct): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER A~IEASUREU MAX[MUNI
DIARKED SLUMP DATE AGE LOAD
SET NO. (incl~cs) TESTED (days) (Ibs. force)
7 I 5.25 04/21/1998 7 98930
7 2 5.25 04/21/1998 7 97900
Average
7 3 5.25 05/12/1998 28
7 4 5.25 05/12/1998 28
Technician: Eddie Elrod Started: Finished:
Report Distribution:
(t) Lincoln Property Company (1) City ofCoppell/Bldg. Insp.
(I) Butler Construction (I) City of Coppell/Constr. Insp.
(1) O'Brien R Associates
(I) Aecc. Inc.
"this report is exclusively for the use ol'[he client indicated above and shall not be reproduced except in lull without the
UMULATIVE YARDS: 650
OMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3500
3460
3480
Vice President
approval of HBC Engineering, Inc.
UTAK Page 7 of 7
~~ IN-I'I.~ACE DENSITY'~'~STING
"'1
ENGIl~iEERI1VG, INC.
8901 Carpenter Frwy., Suitc #100
Dallas, Texas 75247
Date of Service: 04/13/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Services: In-place density testing.
Report No.: 980957 Report Date
04/22/ 1998
Project No.: 43-245 -97
Project: Coppell Business Center II
Belt Lil e Rd. & Lakeshore Dr.
Coppell Texas
PROJECT DATA
CONTRACTOR: Butler Construction
Laboratory Test Method: ASTI~ D-698
Field Test Method: AST D-2922
AST D-3017
MOISTURE DENSITY RELATIONS:
M/D No.
1
TEST
NO
Description
Lt gr/red/teed brn shaley clay
TEST LOCATION
Firetane
573 Final lift, Station 30+95
574 1' below surface, Station 31+00
575 Final lift, Station 33+95
576 1' below surface, Station 33+97
577 2' below surface, Station 34+00
578 Final lift, Station 36+95
579 1' below surface, Station 37+00
580 2' below surface, Station 39+95
581 Final lift, Station 39+95
582 1' below surface, Station 39+97
583 2' below surface, Station 39+99
584 3' below surface, Station 40+OS
24.9
24.7
24.8
24.6
23.9
23.7
23.9
24.6
24.9
24.7
24.8
23.7
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
Maximum
Moisture % Density pcf
23.5 98.5
FIELD DENSITY TESTS
M/D MOISTURE
No. (%)
Project Requirements
Moisture Density
-1/+3% 95%
DRY DENSITY DENSITY
(pcf) (% max)
95.4
95.6
96.1
95.7
96.0
95.3
95.8
95.4
95.8
96.3
96.1
95.9
97
97
98
97
98
97
97
97
97
98
98
97
approval of HBC Engineering, [nc.
07MP Page I of 2
Report No.: 9809577 ~
a.~
'PEST M/D MOISTURE DRY DENSITY DENSITY
NO TEST LOCATION No. (%) (pct) (% max)
585 Final lift, Station 42+95 1 23.9 953.2 968
586 l' below surface, Station 42+97 1 24.1 95.4 97
587 Final lift, Station 45+95 1 23.7 95.8 97
588 1' below surface, 45+98 1 24.0 95.4 97
589 Final lift, Station 48+95 1 23.9 95.9 97
590 I' below surface, Station 48+97 1 24.1 95.5 ~ 97
591 Final lift, Station 51+95 1 23.9 94.2 96
592 l' below surface, 51+93 1 23.9 94.7 96
Test results on this report meet project specification.
Technician: Tex King i y
Report Distribution:
{ I) Lincoln Property Company (I) City of Coppell/Bldg. Insp.
(1) Butler Construction (I) City of Coppell/Constr. Insp.
(I) O'Brien & Associates
(I) AECC. [nc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
Inc.
). Smith, P.E.
Project Engineer
approval of HBC Engineering, lnc.
p~Mp Page 2 of 2
P^+
CONCRETE COMPRESSIVE STRENGTH TES I'
Report No.: 980801
Date of Service: 03/24/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project No.: 43-245
ENGII~iEERING, INC.
8901 Carpenter Frwy., Suite 11100
Dallas, Texas 75247
Report Date
04/22/ 1998
Project: Coppel Business Center II
Belt Li a Rd. & Lakeshore Dr.
Coppel ,Texas
Services: Obtain samples of fresh concrete at the placement locations, perform
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer Concrete
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 pSl @ 28 Days
SLUMP: 5"
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 1-E.4, 1-E.6, 1-F
CYLINDER
MARKED
SET NO.
1 1
1 2
1 3
1 4
MEASURED
SLUMP DATE
(inches) TESTED
CONCRETE CLASS: 9349
PLACEMENT DATE: 03/24/1998
TIME SAMPLED: 1:25 pm BY: 1
WEATHER CONDITIONS: Clear, Vti
TEMPERATURE (F) -AIR 78 F
TRUCK NO: 526 TICK
AIR CONTENT (%): N/A ur
PLACEMENT LOCATION:
Piers, Building D
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (Ibs.force)
6.25 03/31/1998 7 88010
6.25 03/31/1998 7 84810
Average
6.25 04/21/1998 28 116970
6.25 04/21/1998 28 119380
Average
Technician time on report 9808018.
Technician: Brian Otis Started: Finished:
Report Distribution:
(I) Lincoln Property Company (I) City of Coppel)/Bldg. Insp.
(I) Butler Construction (I) City of Coppel)/Constr. Insp.
(I) O'Brien & Associates
(I) AECC, inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
field test and cast
BATCH TIME: 12:08 pm
n Otis
VCRETE: 74 F
No: 664622
WEIGHT (pcf): N/A
'CUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3110
3000
3060
4140
4220
4180
Engi ,Inc.
tg a Harbour
Vice President
n approval of HBC Engineering, Inc.
OIAK Page I of I
CONCRETE COMPI~aSIVE STRENGTH TES
FsIGINEERII~IG, WC.
8901 Carpenter Frwy„ Suite k100
Dallas, Tcxas 75247
Date of Service: 04/14/1998
Client No.: 52617000
Client: Lincoln Property Company
3300 Lincoln Plaza/Larry Moon
500 North Akard Street
Dallas TX 75201-3394
Project: Coppel Business Center II
Belt Li a Rd. & Lakeshore Dr.
Coppel ,Texas
Services: Obtain samples of fresh concrete at the placement locations, perform requ
compressive strength samples.**
PROJECT DATA
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: QQIk MIX COI1Crete
PLANT: Batch truck
SPECIFICATION REQUIREMENTS
STRENGTH: O pSl @ 28 Days
SLUMP: N/A
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Top of manhole
x CYLINDER
MARKED
SET NO.
1 1
1 2
1 3
1 4
CONCRETE CLASS: 7 Sack
PLACEMENT DATE: U4/14/199$
TIME SAMPLED: 2:30 pm Bv:
WEATHERCONDITIONS: PartlyC
TEMPERATURE (F) -AIR 84 F 1
TRUCK NO: 656 T[CK
AIR CONTENT (%>: N/A ur
PLACEMENT LOCATION:
Manhole, southeast corner of Building A
REPORT OF TESTS
MEASURED MAXIMUM
SLUMP DATE .AGE LOAD
(inches) TESTED (days) (Ibs. force)
1.50 04/21/1998 7 151610
1.50 04/21/1998 7 152940
Average
1.50 05/12/1998 28
1.50 05/12/1998 28
Technician time on report 9809724.
Technician: Eddie Elrod Started: Finished:
Report Distribution:
(I) Lincoln Property Company (l) City of Coppell/Bldg. Insp.
(1) Butler Construction (t) City of Coppel I/Constr. Insp.
(1) O'Brien & Associates
(l) AECC. Inc.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
Report No.: 980972 Report Date
04/22/ 1998
Project No.: 43-245 -97
field test and cast
BATCH TIME: N/A
ie Elrod
VCRETE: 80 F
No: 2899
WEIGHT (pcfj: N/A
'CUMULATIVE YARDS: 1 O
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
5360
5410
5390
Vice President
approval of HBC Engineering, Inc.
OIAK Page l of l
CONCRETE COMPRl'~SIVE STRENGTH TE
ENGIlVEERINC', INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/14/1998 Report No.: 980972$ Report Date
04/22/1998
Client No.: $2617000 Project No.: 43-24$2 97
Client: Lincoln Property Company Project: Coppell usiness Center II
3300 Lincoln Plaza/Larry Moon Belt Lin Rd. & Lakeshore Dr.
$00 North Akard Street
Dallas TX 7$201-3394 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform
compressive strength samples.**
PROJECT DATA
coNTRACTOR: Butler Construction
CONCRETE SUPPLIER: QUIk MlX COriCrete
PLANT: Batch trUCk
SPECIFICATION REQUIREMENT'S
STRENGTH: $000 psi @ 28 Days
sI.UMP: N/A
AIR: N/A
TEST METHOD: ASTM C-143
ASTM C-172
ASTM C-39
SAI\~IPLE LOCATION: Top of manhole
CYLINDER
MARKED
SET NO.
1 1
1 2
MEASURED
SLUMP DATE
(inches) TESTED
1.$0 04/21/1998
1.$0 04/21/1998
1 3
1 4
1.$0 0$/12/1998
1.$0 0$/12/1998
Technician time on report 9809724.
7
7
28
28
Technician: Eddie Elrod Started: Finished:
Report Distribution:
(1) Lincoln Property Company (1) City of Coppell/Bldg. Insp.
(I) Butler Construction (I) City of Coppe111Constr. Insp.
(()O'Brien & Associates (I) Mullen & Powell Technistructures
(() AECC, Inc.
1$1610
1$2940
Average
d field test and cast
BATCH TIME: NIA
.die Elrod
VCRETE: 8O F
No: 2899
WEIGHT (pct): N/A
TIME YARDS: 10
STRENGTH
(Psi)
FRACTURE
TYPE
$360
$410
5390
lge5e Harbour
Vice President
Inc.
'this report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
CONCRETE CLASS: 7 Sack
PLACEMENT DATE: 04/14/1998
TIME SAMPLED: 2:30 pm BY: E~
WEATHER CONDITIONS: Partly C1C
TEMPERATURE (F) -AIR 84 F C(
TRUCK NO: 6$ 6 TICKS'
AIR CONTENT (%): N/A UNC
PLACEMENT LOCATION:
Manhole, southeast corner of Building A
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) (Ibs. force)
OIAK Page I of 1