Loading...
Northlake 635(3)-LR 980615COMPRLaSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/13/1998 ReportNo.: 9812354 Client No.: 52617000 Project No.: 43-2452-97 Report Date 06/15/1998 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Panels 88 & 89 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.50 05/20/1998 1 2 5.50 05/20/1998 1 3 5.50 06/10/1998 1 4 5.50 06/10/1998 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/13/1998 BATCHTIME: 5:49 am TIME SAMPLED: 6:15 am BY: Darrin Phillips WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 71 F CONCRETE: 80 F TRUCK NO: 725 TICKET NO: 712112 AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Panels 85, 88, 89, 90, 95-106 REPORT OF TESTS ACCUMULATIVE YARDS: 50 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 96590 3420 7 94900 3360 Average 3390 28 117780 4170 28 115480 4080 Average 4130 FRACTURE TYPE 01AK This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 2 'CONCRETE COMPR ' SIVE STRENGTH Date of Service: 05/13/1998 Report No.: Client No.: 52617000 Project No.: Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 9812354 Report Date 06/I 5/1998 43-2452-97 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi @ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9337 PLACEMENT DATE: 05/13/1998 BATCH TIME: 6:54 am TIME SAMPLED: 7:15 am BY: Darrin Phillips WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 725 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 Cloudy 72 E CONCRETE: 79 F TICK~TNO: 712120 UN1TWEIGHT(pc0: N/A SAMPLE LOCATION: Panels 105 & 106 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 1 5.50 2 2 5.50 2 3 5.50 2 4 5.50 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/20/1998 7 105180 05/20/1998 7 109740 Average 06/10/1998 28 135270 06/10/1998 28 137450 Average ACCUMULATIVE YARDS: COMPRESSIVE STRENGTH (psi) 3720 3880 3800 4780 4860 4820 130 FRACTURE TYPE Technician: Darrin Phillips Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, Inc. Started: 3:00 am Finished: 9:00 am (1) City ofCoppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. (1) Mullen & Powell Technistructures ~ Eng~ Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/03/1998 Report No.: 9814276 Report Date 06/15/1998 Client No.: 52617000 Project No.: 43-2452-97 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9349 PLACEMENT DATE: 06/03/1998 BATCH TIME: 6:45 am TIME SAMPLED: 7:30 am BY: Del Ratliff WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1843 AIR CONTENT (%): N/A PLACEMENT LOCATION: Warm, hazy, light wind 80 F CONCRETE: 88 F TICKET NO: 712494 UNrr WEIGHT (pc0: N/A Leaveout around inside perimeter west and southeast sides of Building C slab-on-grade SAMPLE LOCATION: 60'N/5'E of SW bldg. corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I 1 5.50 06/10/1998 I 2 5.50 06/10/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 20 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 93540 3310 7 97310 3440 Average 3380 I 3 5.50 07/01/1998 I 4 5.50 07/01/1998 28 28 FRACTURE TYPE Technician: Del Ratliff Report Distribution: (i) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (I) AECC, lAC. Started: 5:00 am Finished: 9:00 am (1) City ofCoppell/Bldg, insp. (I) City ofCoppell/Constr, lnsp. (I) Mullen & Powell Technistructures ~'ugene~'Harbour Vice President This report is exclusively ibr the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0IAK Page 1 of I CONCRETE COMPR r' SIVE STRENGTH Date of Service: 06/01/1998 Report No.: 9814032 Client No.: 52617000 Project No.: 43-2452-97 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 06/15/1998 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Concrete PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 06/01/1998 BATCHTIME: 8:20 am TIME SAMPLED: 8:28 am BY: Marlo Villanueva WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1842 AIR CONTENT (%): 4.3 PLACEMENT LOCATION: Clear 80 F CONCRETE: 72 F TICKET NO: 712422 UNIT WEIGHT (pcl): N/A Parking lot at northwest comer of Building A SAMPLE LOCATION: 75'S/28'W of NW corner CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 5.25 1 2 5.25 1 3 5.25 1 4 5.25 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 06/08/1998 7 93930 06/08/1998 7 92700 Average 06/29/1998 28 06/29/1998 28 ACCUMULATIVE YARDS: 220 COMPRESSIVE STRENGTH (psi) 3320 3280 3300 FRACTURE TYPE Technician: Mario Villanueva Report Distribution: (1) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associates (1) AECC, Inc. Started: 8:00 am Finished: 9:30 am (1) City ofCoppcll/Bldg, lnsp. (1) City ofCoppcll/Constr, lnsp. (1) Mullen & Powell Technistructures ~-ugeflLa~arbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page I of I