Northlake WE P12-CS 900511 DON A TIPTON, INC. CONSULTING ENGINEERS 3247 ENGINEERING · SURVEYING · PLANNING 6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967 May 11, 1990 Mr. Larry Davis CITY OF COPPELL 255 Parkway Blvd. Coppell, Texas 75019 RE: NORTHLAKE WOODLA~NrDS EAST NO. 12 Coppell, Texas Dear Mr. Davis, This letter is to confirm that Lots 1 - 9, Block "F" on the above mentioned project will be above the 100 year Floodplain elevation when the fill construction has been completed as per sheets 8 and 9 of the development plans. The Reclamation Study has been approved by the City Engineering Department, Ginn & Associates, Kimley Horn, Inc. and processed thru F.E.MA. Sincerely, DON A. TIPTON, INC. Robert Porter Project Manager RP :mt CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE ASSIGNED INSPECTOR: I. ATTENDANCE: ( See Attached List ) II. ?LhNS FURNISHED TO: A) CIT~ YES NO B) CONTRACTOR YES NO C ) U.,qNER YES NO III. UTILITY CCIqP~IES NOTIFIED: A ) TELEPHONE B) GAS C ) ELECTRIC D ) CABLE T.V. E ) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES NO HIGHWAY PERMIT YES NO RAILROAD PERMIT YES NO STREET CUT PERMIT YES NO BORING PERMIT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR /~ "*' '/ ~ AFl'ER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME RATES". Cd'~/CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORM SEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES NO B. TRAFFIC DETOUR YES NO C. WARNING LIGHTS YES NO IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: ADDRESS: PHONE: PROJECT MAMAGER: CONSULTING ENGI~mER: ADDRESS: PHONE: ~-- Z (3) GENERAL CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: X. GENERAL: DATE AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES AS-BUILT DR~I~ - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK Sh~E.T COMPLETED/ STREET ASSESSMENTS WATER AND SEWER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: ~ 4 ~ LETi~ER OF ACCEPTANCE WRITI'EN DATE: LETTER OF ACCEPTANCE WILL NOT BE WRI%'FEN UNTIL THE PUNCH LIST MADE FROM ~ WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMII~fING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVEMENT, STRENGTH, THICKNESS SCREEN WALL. DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPPEI.L ENGINEERING DEPARTMENT. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FIT]TIBKLS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL. 4' BURY ON HYDRANTS. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ). COLOR CODE HYDRANTS, TOP BONNET AND CAPS. CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. TEMPORARY SANITARY FACILILTIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE ~ITI~MENT. LANDSCAPE MAINTENANCE AGREEMENT. (5) PRE. CNSTRCTN. PZAGN