Northlake WE P12-CS 900511 DON A TIPTON, INC.
CONSULTING ENGINEERS 3247
ENGINEERING · SURVEYING · PLANNING
6330 Belt Line Road Suite C GARLAND, TEXAS 75043 (214) 226-2967
May 11, 1990
Mr. Larry Davis
CITY OF COPPELL
255 Parkway Blvd.
Coppell, Texas 75019
RE: NORTHLAKE WOODLA~NrDS EAST NO. 12
Coppell, Texas
Dear Mr. Davis,
This letter is to confirm that Lots 1 - 9, Block "F" on the above
mentioned project will be above the 100 year Floodplain elevation
when the fill construction has been completed as per sheets 8 and 9
of the development plans. The Reclamation Study has been approved by
the City Engineering Department, Ginn & Associates, Kimley Horn, Inc.
and processed thru F.E.MA.
Sincerely,
DON A. TIPTON, INC.
Robert Porter
Project Manager
RP :mt
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
ASSIGNED INSPECTOR:
I. ATTENDANCE: ( See Attached List )
II. ?LhNS FURNISHED TO: A) CIT~ YES NO
B) CONTRACTOR YES NO
C ) U.,qNER YES NO
III. UTILITY CCIqP~IES NOTIFIED:
A ) TELEPHONE
B) GAS
C ) ELECTRIC
D ) CABLE T.V.
E ) OTHER
IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
EASEMENTS YES NO
HIGHWAY PERMIT YES NO
RAILROAD PERMIT YES NO
STREET CUT PERMIT YES NO
BORING PERMIT YES NO
V. INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR /~ "*' '/
~ AFl'ER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
RATES".
Cd'~/CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SEWER/STORM SEWER/
PAVING CONSTRUCTION BEGINS.
(2)
VI. TESTING OF MATERIALS:
1. DENSITIES
2. APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES NO
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
ADDRESS:
PHONE:
PROJECT MAMAGER:
CONSULTING ENGI~mER:
ADDRESS:
PHONE: ~-- Z
(3)
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
X. GENERAL: DATE
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
AS-BUILT DR~I~ - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK Sh~E.T COMPLETED/
STREET ASSESSMENTS
WATER AND SEWER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
~ 4 ~
LETi~ER OF ACCEPTANCE WRITI'EN DATE:
LETTER OF ACCEPTANCE WILL NOT BE WRI%'FEN UNTIL THE PUNCH LIST MADE FROM
~ WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMII~fING: AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER
TO THE CITY OF COPPEI.L ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL
REPORTS ARE RECEIVED.
COR-TEN BOLTS IN FIT]TIBKLS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ).
COLOR CODE HYDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINEERING DEPARTMENT.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE ~ITI~MENT.
LANDSCAPE MAINTENANCE AGREEMENT.
(5)
PRE. CNSTRCTN.
PZAGN