Loading...
Northlake WE P12-CS 890727July 27, 1989 MEMORANDUM TO: Russell R. Doyle, P.E., City Engineer FRO!{: Larry Davis, Construction Inspector I) Approved Engineering Plans Required - Stamped & Signed by the City Engineer 2) Approved Site Plan for Excavation 3) Pre-Construction Conference With The Engineering Construction Inspector Required Prior to Start of Construction Excavation Permit Required 5)Utility Construction Permit Required Paving Construction Permit Required 7) Additional Permitting May Be Required - Other City Departments, State, County and Federal 8) Early Rough Grading Must Be Approved Separately LD/!sg PERM.N,~