Loading...
Northlake 635(3)-LR 980914..CONCRETE COMPRr"SSIVE STRENGTH TE?'T 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 07/28/1998 Report No.: 9819820 09/14/1998 Client No.: 52617000 Project No.: 43-2452-97 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" N/A ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/28/1998 BATCHTIME: 10:14 am TIME SAMPLED: 10:30 am BY: Terry L. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: 1805 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving West side of Bldg. D Clear and Hot 94 F CONCRETE: 92 F TICKETNO: 729192 UNIT WEIGHT (pct'}: N/A SAMPLE LOCATION: 50' W, 50'N of SW corner REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I 1 6.50 08/04/1998 7 99810 1 2 6.50 08/04/1998 7 100260 Average I 3 6.50 08/25/1998 28 133020 I 4 6.50 08/25/1998 28 135460 Average ACCUMULATIVE YARDS: 340 COMPRESSIVE STRENGTH (psi) 3530 3550 3540 4700 4790 4750 FRACTURE TYPE This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc wriRcn approval of HBC Engineering, Inc. 01TM Page 1 of 4 -,.CONCRETE COMPRr"3SIVE STRENGTH TE'"'F 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/1998 ReportNo.: 9819820 Client No.: 52617000 Project No.: 43-2452-97 Report Date 09/14/1998 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/28/1998 BATCH TIME: N/A TIME SAMPLED: 11:00 am BY: TerryL. Smith WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1805 AIR CONTENT (%): N/A PLACEMENT LOCATION: See Page I Clear and Hot 99 F CONCRETE: 95 F TICKET NO: 729197 UNIT WEIGHT (pcO: N/A SAMPLE LOCATION: 40'W, 100~ of ST comer REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 6.00 08/04/1998 7 104570 2 2 6.00 08/04/1998 7 100060 Average 2 3 6.00 08/25/1998 28 124940 2 4 6.00 08/25/1998 28 126510 Average ACCUMULATIVE YARDS: 380 COMPRESSIVE STRENGTH (psi) 3700 3540 3620 4420 4470 4450 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 2 of 4 ...CONCRETE COMPI SIVE STRENGTH TE "Y 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/1998 Client No.: 52617000 Report No.: 9819820 Project No.: 43-2452-97 Report Date 09/14/1998 Client: Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Project: Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS STRENGTh: 4000 psi ~ 28 Days SLUMP: 5" aiR: N/A TEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/28/1998 BATCrI TIME: 12:10 pm TIME SAMPLED: 12:45 pm BY: Terry L. Smith WEATHER CONDITIONS: Clear and Hot TEMPERATURE (F} - AIR 100 F CONCRETE: 98 F TRUCK NO: 853 TICm~T NO: 729210 AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See Page ! SAMPLE LOCATION: ! 50'N, 20' W of SW Comer CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 I 6.50 08/04/1998 3 2 6.50 08/04/1998 3 3 6.50 08/25/1998 3 4 6.50 08/25/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 470 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 92570 3270 7 95410 3370 Average 3320 28 126400 4470 28 127480 4510 Average 4490 FRACTURE TYPE This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page 3 of 4 ,.CONCRETE COMPR SIVE STRENGTH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/1998 Report No.: 9819820 Client No.: 52617000 Project No.: 43-2452-97 Report Date 09/14/1998 Client: Lincoln Property Company Project: 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 Coppell Business Center II Belt Line Rd. & Lakeshore Dr. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 16 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" N/A ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9351 PLACEMENT DATE: 07/28/1998 BATCH TIME: TIME SAMPLED: 2:00 pm BY: Terry L. Smith WEATHER CONDITIONS: Clear and Hot TEMPERATURE (F) - AIR 102 F CONCRETE: 99 TRUCK NO: 1805 TICKET NO: 729221 AIR CONTENT (%): N/A PLACEMENT LOCATION: See Page I 1:42 pm F UNIT WEIGHT (pc0: N/A SAMPLE LOCATION: 180' N, 90'W of SW Corner CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 I 5.00 08/04/1998 4 2 5.00 08/04/1998 4 3 5.00 08/25/1998 4 4 5.00 08/25/1998 REPORT OF TESTS ACCUMULATIVE YARDS: 540 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. force) (psi) 7 108310 3830 7 129250 4570 Average 4200 28 145200 5130 28 148330 5250 Average 5190 FRACTURE TYPE Technician: Terry L. Smith Report Distribution: (i) Lincoln Property Company (I) Butler Construction (l) O'Brien & Associates (l) AECC, Inc. Started: 10:00 Finished: 4:30 pm ( I ) City of Coppell/Bldg. lnsp. ( I ) City of Coppell/Constr. lnsp. (I) Mullen & Powell Technistmctures Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 4 of 4