Loading...
Northlake 635(5)-LR000913CONCRETE COMPR"SSIVE STRENGTH TE"' Date of Service: Client No.: Client: 08/15/2000 Report No.: 85229000 Project No.: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 00212~ 9499 lz Coppe] 1221 S Coppel Services: Obtain samples of fresh concrete at the placement locations, perform requ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENaTm 4000 psi @ 28 Days 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~X I.D.: 9351 PLACEMENT DATE: 08/15/200~ TIME SAMPLED: 10:48am BY: WEATHER CONDITIONS: Clear TEMPwRArORE(~3.AIR 98 F TRUCK NO: 1097 TIC~ AIR CONTENT (%): 4.8 PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 4.75 08/22/2000 7 63270 2 2 4.75 08/22/2000 7 66710 Average 2 3 4.75 09/12/2000 28 99490 2 4 4.75 09/12/2000 28 100350 Average Sample location: 110' North, 20' W of SE end of left turning lane This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the 01LL Page 2 of 3 a division of~t~'-~:~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 :3 Report Date 09/13/2000 .56 Commerce Center Beltline (Bldg. A) 1, Texas ired field test and cast BATCH TIME: 10.' 13am elario Villanueva CONCRETE: 94 F ~TNO: 651923 U ~IT WEIGHT (pcf): N/A CCUMULATIVE YARDS: 1 i0 COMPRESSIVE STRENGTH (psi) 2240 2360 2300 3520 3550 FRACTURE TYPE -ittcn approval of HBC Engineering, Inc. CONCRETE COMPR'"3SIVE STRENGTH TE e"? Date of Service: 08/15/2000 Report No.: Client No.: 85229000 Project No.: Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 00212: 949914 Coppel] 1221 S. Coppel] Services: Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 08/15/2000 TreE SAMPLED: l:40pm WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1805 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page 1 REPORT OF TESTS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 ! 5.00 08/22/2000 7 69260 3 2 5.00 08/22/2000 7 68920 Average 3 3 5.00 09/12/2000 28 95760 3 4 5.00 09/12/2000 28 97530 Average Sample location: 10' South, 80' W fire lane of NE corner of approac Technician: Mario Villanueva Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technis~'uctures, Inc. (1) Butler Construction Started: 9:00am Finished: 3:00pm ~ (1) City of Coppell (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri ENCtNEI~,~, II~ a aivisio, of'l~fr-ac~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Commerce Center Beltline (Bldg. A) Texas Report Date 09/13/2000 ed field test and cast BATCH TIME: 12:19pm BY: l~Iario Villanueva Clear 1 99 F ~ONCRETE: 94 ~ TICKET NO: 651939 Ub IT WEIGHT (pc0: N/A AI;CUMIJLATIVE YARDS: 218 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2450 2440 2450 3390 3450 3420~ entrance~ Vice President approval of HBC Engineering, lac. 01LL Page 3 of 3 CONCRETE cOMPRESSIVE STRENGTH TES £ a clivision ofl~m-~c~n 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 08/15/2000 Report No.: 002128 09/13/2000 Client No.: 85229000 Project No.: 949914 6 Client: Transwestem Property Company Project: Coppel Commerce Center Attn: James Gaspard 1221 S. Beltline (Bldg. A) 12221 Merit Drive, #450 Coppel Texas Dallas TX 75251 Services: Obtain samples of fresh concrete at the placement locations, perform requi ed field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction MIX I.D.: 9351 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 08/15/200(~ BATCH TIME: 8:36am PLANT: 22 TIME SAMPLED: 9:28am BY: [Vlario Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear 1 STRENGTH: 4000 psi @ 28 Days T~MPERATURE (F)-AIR 95 F ~ONCRETE: 92 F SUtmP: 3-5" TRUC~ NO: 1097 TICI~T NO: 651910 AIR: 3-6% AIR CONTENT (%): 4.8 UI qIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Left turning lane off Beltline and fire lane at ;E corner of entrance approach ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ;CUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 08/22/2000 7 94880 3360 1 2 5.00 08/22/2000 7 92160 3260 Average 3310 1 3 5.00 09/12/2000 28 113910 4030 I 4 5.00 09/12/2000 28 111940 3960 Average 4000 Sample location: 50' North, 5' E of S end of left turning lane This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ritten approval of HBC Engineering, Inc. O1LL Page 1 of 3