Loading...
Northlake 635(5)-LR000817CONCRETE COMPRL3SIVE STRENGTH TES Date of Service: 07/19/2000 Report No.: 001877' Client No.: Client: Services: 85229000 Project No.: 949914: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell 1221S. Coppell Obtain samples of fresh concrete at the placement locations, perform requi compressive strength samples. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/17/2000 Commerce Center Beltline (Bldg. A) Texas ed field test and cast SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" max N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 7.00 07/26/2000 1 2 7.00 07/26/2000 1 3 7.00 08/16/2000 1 4 7.00 08/16/2000 PROJECT DATA MIX I.D.: 9349 PLACEMENT DATE: 07/19/200C TIME SAMPLED: 6:30am BY: WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 88 F TRUCK NO: 1097 TICI~ AIR CONTENT (%): N/A PLACEMENT LOCATION: Slab-on-grade (leave-outs) REPORT OF TESTS A MAXIMUM AGE LOAD (days) Obs. force) 7 107910 7 106680 Average 28 131060 28 130040 Average BATCH TIME: 5:30am ]rvin Farris :ONCRETE: 86 F gT NO: 650281 liT WEIGHT (pcf): N/A :CUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 3820 3770 3800 4630 4600 4620 FRACTURE TYPE Sample location: Building A S wing NW corner to 75' E Technician: Ervin Farris Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (l) Technisa'uctures, Inc. (I) Butler Construction Started: 5:00am Finished: 7:00am ~ (1) City of Coppell (1) City of Coppell This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~ 01LL Page I of 1 Eugene Harbour Vice President itten approval of HBC Engineering, Inc.