Northlake 635(5)-LR000810CONCRETE COMPI SSIVE STRENGTH
Date of Service: 07/11/2000 Report No.: 00179!
Client No.: 85229000 Project No.: 94991,
Client:
Services:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive,//450
Dallas TX 75251
Project: Coppe
1221
Copp,
Obtain samples of fresh concrete at the placement locations, perform reqt
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
MIX I.D.: 9349
PLACEMENT DATE? 07/11/2013
TIME SAMPLED: 10:20am BY:
WEATHER CONDITIONS: Warm.
TEMPERATURE(F)- AIR 80 F
TRUCK NO: 1888 TIC
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
S side of building leaveouts on building A
SAMPLE LOCATION: 20' W of SE comer of building
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
1 I 6.00 07/18/2000
1 2 6.00 07/18/2000
1 3 6.00 08/08/2000
1 4 6.00 08/08/2000
MAXIMUM
AGE LOAD
(days) (lbs. force)
7 108000
7 117880
Average
28 153990
28 146670
Average
Technician: Terry L. Smith
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
Started: 8:30am Finished: 2:30pm I'~
(1) City of Coppell
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
)7
[56
ENGINEERIb~,
a division
8901 Carpenter Frwy., Suite #101
Dallas, Texas 75245
Report Date
08/10/2000
[I Commerce Center
Beltline (Bldg. A)
Texas
ired field test and cast
0 BATCH TIME: hl5pm
Terry L. Smith
partly cloudy
CONCRETe: 89 F
C~T NO: 509970
~IIT WEIGHT (pcf): N/A
CCUMULATIVE YARDS: 30
COMPRESSIVE
STRENGTH
(psi)
3820
4170
4000
5450
5190
5320
FRACTURE
TYPE
Eng~
Euge'~ne Harbour
Vice President
a, ritten approval of HBC Engineering, Inc.
01LL Page 1 of 1
REPORT OF REINFORCING STEEL INSPECTION
Date of Service: 08/15/00
Client No.: 85229000
Client: Transwestern Property Company
12221 Merit Drive, #450
Dallas, Texas 75251
Report No.: 002130
Project No.: 949914
Project: Coppe[
1221 S.
CoppeI
Services:
Observe placement of reinforcing for compliance with furnished
PROJECT DATA
Drawings Utilized:
Locations/Items Inspected:
Test Method:
Left turning lane off Beltline Road and Fire Lane at SE
approach
Visual Observation
REPORT OF INSPECTION
8~0'1 C~CmCF Frw~., Su~ #100
Dalt~ Tex~s 75247
3
56
Commerce Center
Beltline (Bldg. A)
Texas
lrawings.
corner off the entrance
rrEM$ INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT iNCORRECT ITEMS ~$PECTEO CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X column Tied l~topm'ly
Bar Size X Proper Bar Placement X ties and Spa~es
Bar Grade X Properly Tied X Stirrup Spacilg/Type
Rebar Clean X Dowel Bars in Place X Nelded Splices
Form Clean X Proper Bar Suppo~s X ~Yaanicel S~lices
.~ of Ba~ X L~p~ sp,ce~ X ~' ,~o~ c~ X
Discrepancies/Comments: No discrepancies noted at the time of inspection.
Technician: M. Villanueva Started: 8:00 a.m.
Stopped: 9:00 a.m.
ReuoIt Distribution:
(1) Tra~swcstcm Prope~ Company
(1) O'Brien & Associates
(1) Teclmismactures, Inc.
(1) Butler Construction
(1) City of Coppell
(1) City of Coppell
309sds
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval al
Engineering, Inc.
Eugene Harbour
Vice President
HBC Engineedng, Inc.