Loading...
Northlake 635(5)-LR000802CONCRETE COMPRF SIVE STRENGTH TE? Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0019289 9499145 Coppell 1221 S. ~ Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 4:08am BY: ~ WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 72 F c TRUCK NO: 1097 TICK~ AIR CONTENT (%): 4.6 UN PLACEMENT LOCATION: Paving at W side of loading dock Sample was obtained at point of discharge of [ REPORT OF TESTS A£ CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 5.75 08/01/2000 I 2 5.75 08/01/2000 MAXIMUM AGE LOAD (days) (lbs. force) 7 80840 7 78890 Average I 3 5.75 08/22/2000 28 I 4 5.75 08/22/2000 28 Sample location: 10' N, 240' E of SW corner of Building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri: 0ILL Page 1 of 9 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 Commerce Center ~eltline (Bldg. A) Texas ~d field test and cast BATCH TIME: 3:35am Iario Villanueva :)NCRETE: 76 T NO: 650643 ~T WEIGHT (pcf): N/A ump hose. CUMULATIVE YARDS: 10 COMPRESSIVE STRENGTH (psi) 2860 2790 2830 FRACTURE TYPE ten approval of HBC Engineering, Inc. .CONCRETE COMPRF SIVE STRENGTH TES Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 001928~ 9499145 Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requir compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 5:35am BY: 1~ WEATHER CONDITIONS: Partly el, TEMPERATURE (F) - AIR 72 F C TRUCK NO: 739 TICK~ AIR CONTENT (%): 5.0 UN PLACEMENT LOCATION: See page I REPORT OF TESTS A£ CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.50 08/01/2000 7 82710 2 2 5.50 08/01/21300 7 82490 Average 2 3 5.50 08/22/2000 28 2 4 5.50 08/22/2000 28 Sample location: 90' North, 230' E of SW corner of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01LL Page 2 of 9 ENGINEERI~, INC. a division of'ffefrac~n 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 ~'ommerce Center ;eltline (Bldg. A) Texas ~d field test and cast BATCH TIME: 5:00am lario Villanueva )udy 3NCRETE: 74 F TNO: 650655 iT WEIGHT (pcB: N/A CUMULA~VEYARDS: 140 COMPRESSIVE STRENGTH (psi) 2920 2920 2920 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE o$IVE STRENGTH TES Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 7525 ! SLUMP: AIR: TEST METHOD: a division of'l~carl-~j~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 0019289 Report Date 08/02/2000 9499145~ ' ! Coppell ~2ommerce Center 1221 S. t~eltline (Bldg. A) Coppell, [l'exas Obtain samples of fresh concrete at the placement locations, perform requir{ compressive strength samples. PROJECT DATA MIX I.D.: 935 1 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 7:10am BY: 1~ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 1064 AIR CONTENT (%): 4.4 PLACEMENT LOCATION: See page I Partly c1¢ 73 V O TICKE UNI REPORT OF TESTS AC CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 See below SAMPLE LOCATION: MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) CYLINDER MARKED SET NO. 3 1 5.75 08/01/2000 7 86510 3 2 5.75 08/01/2000 7 87050 Average 3 3 5.75 08/22/2000 28 3 4 5.75 08/22/2000 28 Sample location: 60' North, 130' E of SW corner of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01LL Page 3 of 9 ~,d field test and cast BATCH TIME: 6:40am iario Villanueva ,udy )NCRETE: 75 F r NO: 650667 r WEIGHT (pcf): N/A 2UMULATIVEYARDS: 260 ~OMPRESSIVE STRENGTH (psi) 3060 3080 3070 FRACTURE TYPE :en approval of HBC Engineering, Inc. CONCRETE COMPRE SIVE STRENGTH TES' Date of Service: 07/25/2000 Report No.: 0019289 Client No.: 85229000 Project No.: 9499145 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell 1221 S. ] Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 8:10am BY: 1~ WEATHER CONDITIONS: Partly ch TEMPERATURE (F) - AIR 72 F C, TRUCK NO: 1097 TIC~ AIR CONTENT (%): 4.7 UN] PLACEMENT LOCATION: See page 1 REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 4 1 5.50 08/01/2000 7 89510 4 2 5.50 08/01/2000 7 92000 Average 4 3 5.50 08/22/2000 28 4 4 5.50 08/22/2000 28 Sample location: 20' North, 40' E of SW corner of bldg. A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01LL Page 4 of 9 a division of 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Report Date 08/02/2000 2ommerce Center lelttine (Bldg. A) Texas ~d field test and cast BATCH TIME: 7:20am [ario Villanueva >udy ~NCRETE: 77 F r NO: 650676 T WEIGHT (prig: N/A CUMULATIVE YARDS: 350 COMPRESSIVE STRENGTH (psi) 3170 3250 3210 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPRE' SIVE STRENGTH TES? Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0019289 9499145 Coppell 1221 S. CoppeH Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MLX I.D.: 9351 PLACEMENT DATE: TIME SAMPLED: 8:10am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 727 AIR CONTENT (%): 4.6 PLACEMENT LOCATION: See page 1 07/25/2000 BY: ~ Partly ch 75 F O TICKE UN] REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 5 1 5.25 08/01/2000 7 89600 5 2 5.25 08/01/2000 7 85590 Average 5 3 5.25 08/22/2000 28 5 4 5.25 08/22/2000 28 Sample location: 180' North, 240' E of SW corner of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01LL Page 5 of 9 a aivision of 1Fenacan 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 ',ommerce Center eltline (Bldg. A) Texas :d field test and cast BATCH TIME: 7:45am [ario Villanueva ~udy )NCRETE: 80 F rNO: 650685 T WEIGHT (pc0: N/A CUMULATIVE YARDS: 430 COMPRESSIVE STRENGTH (psi) 3170 3030 3100 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH TES Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0019289 9499145, Coppell ~ 1221 S. l Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MLX I.D.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 10:15am BY: ~V WEATHER CONDITIONS: Partly ck TEMPERATURE (F). AIR 80 F TRUCK NO: 108 TICKE AIR CONTENT (%): 5.1 UNI PLACEMENT LOCATION: See page 1 REPORT OF TESTS AC, CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 6 1 5.75 08/01/2000 7 88550 6 2 5.75 08/01/2000 7 91070 Average 6 3 5.75 08/22/2000 28 6 4 5.75 08/22/2000 28 Sample location: 110' North, 190' E of SW conrer of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~ 0ILL Page 6 of 9 a division of'l~tfr"~cL~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 ommerce Center leltline (Bldg. A) Texas :d field test and cast BATCH TIME: 9:55am iario Villanueva ,udy }NCR~TE: 79 F NO: 650702 WEIGHT (pet'): N/A UMULATIVE YARDS: 540 ~OMPRESSIVE STRENGTH (psi) 3130 3220 3180 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPRE SIVE STRENGTH TES- Date of Service: Client No.: Client: Services: 07/25/2000 Report No.: 85229000 Project No.: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive,//450 Dallas TX 75251 0019289 9499145 Coppell 1221S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTI~: 4000 psi @ 28 Days 3-5" 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.O.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: ll:40am BY: ~V WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1097 AIR CONTENT (%): 4.7 PLACEMENT LOCATION: See page 1 Partly cl( 83 F O TICKE UNI REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 7 I 5.25 08/01/2000 7 83780 7 2 5.25 08/01/2000 7 87990 Average 7 3 5.25 08/22/2000 28 7 4 5.25 08/22/2000 28 Sample location: 170' North, 140' E of SW corner of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 0ILL Page 7 of 9 a division of]~"'~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 '.ommerce Center ~eltline (Bldg. A) Texas field test and cast BATCH T~E: 10:54am [ario Villanueva ludy )NCRETE: 82 F rNO: 650716 lv WEIGHT (pcf): N/A ~UMULATIVE YARDS: 650 2OMPRESSIVE STRENGTH (psi) 2960 3110 3040 FRACTURE TYPE en approval of HBC Engineering, Inc. CONCRETE COMPRF $IVE STRENGTH Date of Service: Client No.: Client: Services: 07/25/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0019289 Project No.: 9499145 Project: Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX l.O.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 12:50pm BY: l~ WEATHER CONDITIONS: Partly ch TEMPERATURE (F). AIR 92 F C~ TRUCK NO: 739 TICKE AIR CONTENT (%): 5.0 UN] PLACEMENT LOCATION: See page I REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLLrMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 8 1 5.75 08/01/2000 7 76030 8 2 5.75 08/01/2000 7 79380 Average 8 3 5.75 08/22/2000 28 8 4 5.75 08/22/2000 28 Sample location: 120' N, 95' E of SW corner of Bldg. A This report is exclusively for the use of the client indicated abov6 and shall not be reproduced except in full without the wri{ 0ILL Page 8 of 9 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 08/02/2000 ',ommerce Center 5eltline (Bldg. A) Texas field test and cast BATCH TIME: 1 l:58am [ario Villanueva >udy )NCRETE: 86 F r NO: 650725 T WEIGHT (pc/): N/A CUMULATIVE YARDS: 750 COMPRESSIVE STRENGTH (psi) 2690 2810 2750 FRACTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRE $IVE STRENGTH TES? Date of Service: Client No.: Client: Services: 07/25/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0019289 Project No.: 9499145 Project: Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 3-5" 3-6% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/25/2000 TIME SAMPLED: 2:10pm BY: 1~ WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 736 AIR CONTENT (%): 4.8 PLACEMENT LOCATION: See page 1 Partly ck 97 F TICKE UNI REPORT OF TESTS AC CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 9 1 5.50 08/01/2000 9 2 5.50 08/01/2000 9 3 5.50 08/22/2000 9 4 5.50 08/22/2000 Sample location: 185' North, 30' E of MAXINIUM AGE LOAD (days) (lbs. force) 7 84590 7 88220 Average 28 28 SW corner of building A a division of 1 [cn'mcnn 8901 Carpenter Frwy., Sulte #100 Dallas, Texas 75247 Report Date 08/02/2000 ',ommerce Center leltline (Bldg. A) Texas field test and cast BATCHTIME: l:19pm [ario Villanueva ludy )NCRETE: 89 F NO: 650736 ' WEIGHT (pcf): N/A 2UMULATIVE YARDS: 840 ',OMPRESSIVE STRENGTH (psi) 2990 3120 3060 FRACTURE TYPE Technician: Mario Villanueva Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistructures, Inc. (1) Butler Construction Started: 2:30am (1) City of Coppell (1) City of Coppell Finished: 3:30pm This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr :~ugene Harbour Vice President en approval of HBC Engineering, Inc. 0ILL Page 9 of 9