Loading...
Northlake 635(5)-LR000731CONCRETE COMPRE SIVE STRENGTH TES Date of Service: 06/30/2000 Client No.: 85229000 Report No.: 0017145 Project No.: 9499145 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5" AIR: 3-6% TEST METItOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIXI.D.: 9351 PLACEMENT DATE: 06/30/2000 TIME SAMPLED: 4:25am ~v: E WEATHER CONDITIONS: Cloudy TEMPERATURE (F) - AIR 76 F TRUCK NO: 33 TICKLE AIR CONTENT(%): 3.8 UNI PLACEMENT LOCATION: Paving REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 1 1 5.00 07/07/2000 7 88640 ! 2 5.00 07/07/2000 7 90550 Average 1 3 5.00 07/28/2000 28 116450 I 4 5.00 07/28/2000 28 113990 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri 01SDS Page 1 of 6 ENGINEERING, INC. a division of'l[erracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/31/2000 ~,ommerce Center 3eltline (Bldg. A) Texas ;d field test and cast BATCH TIME: 3:52am 'yin Farris INCRETE: 86 F NO: 616029 WEIGItT (pcf): N/A CUMULATIVE YARDS: 30 COMPRESSIVE STRENGTH (psi) 3130 3200 3170 4120 4030 4080 FRACTURE TYPE approval of HBC Engineering, Inc. ~{eport No.: 0017145 Sample Location: 10 yards E of island at SW corner of Building A, 5 feet S of N curb in parking lot, S side, Building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ en approval of HBC Engineering, Inc. 01SDS Page 2 of 6 CONCRETE COMPRE IVE STRENGTH TES Date of Service: 06/30/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: Project No.: Project: 0017145 9499145¢ Coppell 1221S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 5" AIR: 3-6% TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/30/2000 TIME SAMPLED: 5:55am BY: E1 WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 739 AIR CONTENT (%): 3.6 PLACEMENT LOCATION: See page I Cloudy 76 F C( TICKE UNI' REPORT OF TESTS ACI CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 2 1 5.00 07/07/2000 7 107380 2 2 5.00 07/07/2000 7 100300 Average 2 3 5.00 07/28/2000 28 157540 2 4 5.00 07/28/2000 28 153500 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ! 01SDS Page 3 of 6 a division ~fl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/31/2000 ~.ommerce Center ,eltline (Bldg. A) I'exas d field test and cast BATCH TIME: 5:20AM vin Farris .NCRETE: 86 F NO: 616045 WEIGHT (pcB: N/A ;UMULATIVE YARDS: 130 ~'OMPRESSIVE STRENGTH (psi) 3800 3550 3680 5570 5430 5500 FRACTURE TYPE approval of HBC Engineering, Inc. Report No.: 0017145 Sample Location: 5 feet E of island around water main, 5 feet N of curb on parking lot, S of Building A. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr 01SDS Page 4 of 6 approval of HBC Engineering, lnc. CONCRETE COMPRE'?MVE STRENGTH Date of Service: Client No.: Client: Services: 06/30/2000 Report No.: 85229000 Project No.: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 0017145 9499145, Coppell 1221 S. i Coppell, Obtain samples of fresh concrete at the placement locations, perform requin compressive strength samples. SLUMP: AIR: TEST METItOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTIt: 4000 psi @ 28 Days 5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below for location PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 06/30/2000 TIME SAMPLED: 8:30am BY: E WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 1019 AIR CONTENT (%): 3.8 PLACEMENT LOCATION: See page I Cloudy 88 }: c~ TICKE UNI REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIIVIUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 3 I 7.00 07/07/2000 7 91690 3 2 7.00 07/07/2000 7 90870 Average 3 3 7.00 07/28/2000 28 126610 3 4 7.00 07/28/2000 28 121430 Average This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ 01SDS Page 5 of 6 a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/31/2000 ommerce Center leltline (Bldg. A) Texas ~,d field test and cast BATCH TIME: 7:26am vin Farris ,NCRETE: 89 F 1' NO: 509599 r WEIGHT (pcf): N/A 2UMULATIVE YARDS: 230 20MPRESSIVE STRENGTH (psi) 3240 3210 3230 4480 4290 4390 FRACTURE TYPE ~en approval of HBC Engineering,~nc. Report No.: 0017145 Sample Location: Midway between island at SE corner of sewer drain just W of island, 8 feet S of N curb. Building A ar.d Technician: Ervin Farris Started: 3:00am Finished: l l:00am I'-L~ Report Distribution: (1) Transwestem Property Company (1) City of Coppell (1) O'Brien & Associates (1) City of Coppell ( I ) Technistructures, Inc. (1) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri Engineer~ ;ugene Harbour Vice President en approval of HBC Engineering, Inc. 01SDS Page 6 of 6