Loading...
Northlake 635(5)-LR000728CON'CRETE COMPRESSIVE STRENGTH TES Date of Service: 07/20/2000 Report No.: 0018879 Client No.: 85229000 Project No.: 9499145, Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell 1221 S. i Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. CONT1L4, CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTII: 4000 psi @ 28 Days SLUMP: 4-6" AIR: N/A TEST METHOD: ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 90' E of SE corner of Bldg. A PROJECT DATA MIX I.D.: 935 1 PLACEMENT DATE: 07/20/2000 TIME SAMPLED: 4:50am BY: E WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 32 AIR CONTENT (%): N/A PLACEMENT LOCATION: Paving E of building A Partly ck 81 v o TICKE UNI REPORT OF TESTS AC CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) I I 6.75 07/27/2000 7 77480 I 2 6.75 07/27/2000 7 76890 Average 1 3 6.75 08/17/2000 28 1 4 6.72 08/17/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ Ill LL Page I of 4 ENGINEERING, INC. a dit,isio, of'lf~ftacon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/28/2OOO ommerce Center feltline (Bldg. A) Texas :d field test and cast BATCH TIME: 4:00am :lc Garcia ,udy )NCRETE: 89 F NO: 650333 'WEIGHT (pet): N/A EUMULATIVE YARDS: 70 ~OMPI~SSIVE STRENGTH (psi) 2740 2720 2730 F~CTURE TYPE ten approval of HBC Engineering, Inc. CONCRETE COMPRF -SIVE STRENGTH TES Date of Service: 07/20/2000 Report No.: 0018879 Client No.: 85229000 Project No.: 9499145 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Services: Coppell ~ 1221 S. l Coppell, Obtain samples of fresh concrete at the placement locations, perform requir~ compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION IU~QUIREMENTS STRENGTH: 4000 psi @ 28 Days 4-6" N/A ASTM Co143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX LD.: 9351 PLACEMENT DATE: TIME SAMPLED: .6;48am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 17 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page 1 07/20/2000 BY: E Partly cl( 83 v o TICKE UNI REPORT OF TESTS AC CYLINDER MARKED SET NO. MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 2 1 5.00 07/27/2000 7 76830 2 2 5.00 07/27/2000 7 78300 Average 2 3 5.00 08/17/2000 28 2 4 5.00 08/17/2000 28 Sample location: 90' E, 45' N of SE corner of bldg. A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri~ 01LI. Page 2 of 4 ENGINEERING, INC. a division of ]~!ff-d~lzorl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/28/2000 ~mmerce Center leltline (Bldg. A) Texas field test and cast BATCIt TIME: 5:50am sic Garcia ~udy )NCRETE: 90 F rNO: 652228 T WEIGItT (pcl): N/A :UMULATIVE YARDS: 170 OMPRESSIVE STRENGTH (psi) 2720 2770 2750 FRACTURE TYPE ten approval of HBC Engineering, Inc. CO CRETE COMPRE " SIVE STRENGTH TES? Date of Service: 07/20/2000 Report No.: 0018879 Client No.: 85229000 Project No.: 9499145 Client: Services: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell 1221 S. Coppell, Obtain samples of fresh concrete at the placement locations, perform requir, compressive strength samples. STRENGTII: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 4-6" N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/20/2000 TIME SAMPLED: 8:16am BY: ]x WEATHER CONDITIONS: Partly cl, TEMPERATURE(F)- AIR 85 F C. TRUCK NO: 22 TICKE AIR CONTENT (%): N/A UN] PLACEMENT LOCATION: See page 1 REPORT OF TESTS A£ CYLINDER MEASURED MAXIMUM MA RKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) (lbs. force) 3 I 6.00 07/27/2000 7 87370 3 2 6.00 07/27/2000 7 87910 Average 3 3 6.00 08/17/2000 28 3 4 6.00 08/17/2000 28 Sample location: 60' E, 90' N of SE corner of building A This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri OILL Page 3 of 4 a divaion of l[erracnn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/28/2000 ~.ommerce Center eltline (Bldg. A) Texas '~d field test and cast BATCH TIME: 7:40am · ic Garcia )udy )NCRETE: 90 F NO: 510362 WEIGHT (pcf): N/A :UMULATIVE YARDS: 280 :OMPRESSIVE STRENGTH (psi) 3090 3110 3100 FRACTURE TYPE :ten approval of HBC Engineering, Inc. CONCRETE COMPRF -$IVE STRENGTH TES Date of Service: Client No.: Client: 07/20/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0018879 Project No.: 9499145~ Project: Coppell 1221 S. Coppell, Services: Obtain samples of fresh concrete at the placement locations, perform require compressive strength samples. CONTRACTOR: CONCRETE SUPPLIER: PROJECT DATA Butler Construction MIX I.D.: 9351 Pioneer PLACEMENT DATE: 07/20/2000 ENGINEERING, 1NC. a division ofl[art~ctan 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 07/28/2000 ',ommerce Center ;eltline (Bldg. A) Fexas d field test and cast BATCH TIME: 8:10am PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: 4-6" AIR: N/A 'rEST METHOD: ASTM C- 143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below TIME SAMPLED: 9:30am WEATHER CONDITIONS: TEMPERATURE (F) o AIR TRUCK NO: 1045 AIR CONTENT (%): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 5.00 07/27/2000 4 2 5.00 07/27/2000 4 3 5.00 08/17/2000 4 4 5.00 08/17/2000 Sample location: 150' N, 25' E of SE corner MAXIMUM AGE LOAD (days) (lbs. force) 7 84100 7 84810 Average 28 28 of Building A Technician: Eric Garcia Report Distribution: ( 1 ) Transwestern Property Company (1) O'Brien & Associates (1) Technistructures, Inc. ( 1 ) Butler Construction BY: E] Partly clc 83 v c¢ TICKE' UNr AC~ Started: 3:00am Finished: 10:30am ~ (1) City of Coppell (1) City of Coppell [ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl ic Garcia udy ~NCRETE: 90 F NO: 652249 WEIGHT (pcf): N/A ~UMULATIVE YARDS: 360 ~OMPRESSIVE STRENGTH (psi) 2970 3000 2990 Engine~~,g.~ ugene Harbour Vice President approval of HBC Engineering, Inc. FRACTURE TYPE 0ILL Page 4 of 4