Northlake 635(5)-LR000727 CONCRETE COMPR' ,SIVE STRENGTH
Date of Service: 06/27/2000 Report No.: 001678
Client No.: 85229000 Project No.: 949914,
Client:
Services:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Project: Coppell
1221 S.
Coppell
Obtain samples of flesh concrete at the placement locations, perform requi~
compressive strength samples.
SLUMP:
AIR:
TEST METIIOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
I'LANT: 22
SI'ECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE:
TIME SAMPLED: 5:10am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 1019
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Paving between Buildings A and B
06/27/2000
BY: S
Cloudy
72 F o
TICKE
UNI
Sample taken from truck.
REPORT OF TESTS
AC~
CYLINDER MEASURED
MARKED SLUMP DATE AGE
SET NO. (inches) TESTED (days)
1 1 6.00 07/04/2000 7
1 2 6.00 07/04/2000 7
I 3 6.00 07/25/2000 28
1 4 6.00 07/25/2000 28
Sample location: 220' N x 40' E from SE
MAXIMUM
LOAD
(lbs. force)
100740
105330
Average
120590
120990
Average
corner of bldg. A
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writte~
OILL Page 1 of 4
ENGINEERING, INC.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/20O0
Commerce Center
Beltline (Bldg. A)
Texas
:d field test and cast
BATCH TIME: 4:50am
teve Campbell
)NCRETE: 78 F
rNO: 615768
T WEIGHT (pcf): N/A
~UMULATIVE YARDS: 10
:OMPRESSIVE
STRENGTH
(psi)
3560
3720
3640
4260
4280
4270
FRACTURE
TYPE
approval of HBC Engineering, Inc.
CONCRETE COMPRL/ " $IVE STRENGTH TES?
Date of Service: 06/27/2000 Report No.: 0016787
Client No.: 85229000 Project No.: 9499145,
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppell
1221 S. i
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
MIX I.D.: 935 1
PLACEMENT DATE: 06/27/2000
TIME SAMPLED: 5:40am BY: S
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 101 1
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Cloudy
72 F O
TICKE
UNI
Sample taken from truck.
REPORT OF TESTS
AC
CYLINDER
MARKED
SET NO.
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 I 6.00 07/04/2000 7 97570
2 2 6.00 07/04/2000 7 100030
Average
2 3 6.00 07/25/2000 28 115180
2 4 6.00 07/25/2000 28 117320
Average
Sample location: 210' N x 80' E from SE corner of Bldg. A
This report is exclusively for the use of the clieut indicated above and shall not be reproduced except in full without the wri
{}ILl. Page 2 of 4
ENGINEERING, INC.
a division of lr~rr-~_~n
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
ommerce Center
leltline (Bldg. A)
Texas
field test and cast
BATCH TIME: 5:15am
:eve Campbell
)NCRETE: 81 F
rNO: 615773
T WEIGItT (pcf): N/A
CUMULATIVE YARDS: 10
COMPRESSIVE
STRENGTH
(psi)
3450
3540
3500
4070
4150
4110
FRACTURE
TYPE
en approval of HBC Engineering, Inc.
CONCRETE COMPREC " SIVE STRENGTH TES "
Date of Service: 06/27/2000 Report No.:
Client No.: 85229000 Project No.:
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
0016787
9499145
Coppell
1221S.
Coppell
Obtain samples of fresh concrete at the placement locations, perform requiv
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METIIOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
MIXI.D.: 9351
PLACEMENT DATE:
TIME SAMPLED: 8:00am
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCK NO: 1882
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
Sample taken from truck pump.
06/27/2000
BY: S
Cloudy
72 v
TICKE
UNI
REPORT OF TESTS
AC
CYLINDER MEASURED MAXEMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 I 6.00 07/04/2000 7 99550
3 2 6.00 07/04/2000 7 103690
Average
3 3 6.00 07/25/2000 28 116960
3 4 6.00 07/25/2000 28 119290
Average
Sample location: 195' N x 50' E form SE corner of Bldg. A
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
01LL Page 3 of 4
ENGINEERING, 1NC.
a division of ]~ff"~-~tl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
2ommerce Center
3eltline (Bldg. A)
Texas
:d field test and cast
BATCIt TIME: 7:25am
:eve Campbell
)NCRETE: 82
rNO: 615790
T WEIGHT (pet): N/A
UUMULATIVE YARDS: 10
2OMPRESSIVE
STRENGTH
(psi)
3520
3670
3600
4140
4220
4180
FRACTURE
TYPE
:eh approval of HBC Engineering, Inc.
CONCRETE COMPREr SIVE STRENGTH TESh
Date of Service: 06/27/2000
Client No.: 85229000
Client:
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Report No.:
Project No.:
Project:
0016787
9499145~
Coppell
1221 S. i
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir~
compressive strength samples.
CONTRACTOR:
CONCRETE SUPPLIER:
Butler Construction
Pioneer
PROJECT DATA
MIX I.D.: 935 1
PLACEMENT DATE:
06/27/2000
a division ofl~rr-~Jaa
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
ommerce Center
Ieltline (Bldg. A)
Texas
d field test and cast
BATCH TIME: 8:55am
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
SLUMP: 5.0" Max
aiR: 3-5%
TEST METItOD: ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
TIME SAMPLED: 9:30am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 33
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1.
Sample taken from truck pump.
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 I 6.00
4 2 6.00
4 3 6.00
4 4 6.00
Sample location: 180'
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/04/2000 7 93940
07/04/2000 7 100420
Average
07/25/2000 28 116350
07/25/2000 28 117320
Average
N x 100' E from SE
corner of Bldg. A
Technician: Steve Campbell
Report Distribution:
(I) Transwestem Property Company
(i) O'Brien & Associates
(I) Technistructures, Inc.
(I) Butler Construction
BY: SI
partly clc
76 V C(
TICKE'
UNI'
AC~
Started: 3:00am Finished: 12:00pm I'-.C~_~
(1) City of Coppell
( 1 ) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ!
eve Campbell
udy
~NCRETE: 82 F
;NO: 615803
WEIGHT (pcf): N/A
UMULATIVE YARDS: 10
.'OMPRESSIVE
STRENGTH
(psi)
3320
3550
3440
4110
4150
4130
FRACTURE
TYPE
Engineeri~~c.
.ugene Harbour
Vice President
approval of HBC Engineering, Inc.
0ILL Page 4 of 4
CONCRETE COMPRr'3SIVE STRENGTH
Date of Service:
Client No.:
Client:
07/19/2000 Report No.:
85229000 Project No.:
Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
001877
949914
Coppel
1221 S,
Coppel
Services: Obtain samples of fresh concrete at the placement locations, perform requi
compressive strength samples.
PROJECT DATA
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGX}I: 4000 psi @ 28 Days
5.0" max
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
a division of 1 rarr'4cnn
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
7 Report Date
07/27/2000
56
Commerce Center
Beltline (Bldg. A)
Texas
ed field test and cast
mx I.D.: 9349
PtaCEMENT DATV~: 07/19/200(~ BATC~ X~m: 5:30am
TIME SAMPLED: 6:30am BY: ~rvin Farris
WEATHER CONDITIONS: Clear [
TEMPERATURE (F) . AIR 88 F ~ONCRETE: 86 F
TmJCIC NO: 1097 TlCggTNO: 650281
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
Slab-on-grade (leave-outs)
REPORT OF TESTS
CYLINDER MEASURED
MARKED SLUMP DATE AGE
SET NO. (inches) TESTED (days)
1 i 7.00 07/26/2000 7
1 2 7.00 07/26/2000 7
1 3 7.00 08/16/2000 28
1 4 7.00 08/16/2000 28
Sample location: Building A S wing NW corner to 75' E
Started: 5:00am
(1) City of Coppell
(1) City of Coppell
Technician: Ervin Farris
Report Distribution:
(1) Transwestem Property Company
(l) O'Brien & Associates
(1) Technistructures, Inc.
(1) Butler Construction
MAXIMUM
LOAD
(lbs. force)
107910
106680
Average
Finished: 7:00am
U] HT WEIGHT (pc/): N/A
A CCUMULATIVE.YARDS:
COMPRESSIVE
STRENGTH
(ps0
3820
3770
3800
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wt
Eugene Harbour
Vice President
10
FRACTURE
TYPE
[tten approval of HBC Engineering, Inc.
01LL Page 1 of 1
t ONCRETE COIMPRE IVE STRENGTH TES?
Date of Service: 06/28/2000
Client No.: 85229000
Report No.: 0016888
Project No.: 94991451
Client:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Project: Coppell
1221 S.
Copper
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5"
3-6%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See placement location
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/28/2000
TIME SAMPLED: 4:35am BY: E
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 74 F
TRUCK NO: 80 TICKE
AIRCONTENT (%): 3.8 UNI
PLACEMENT LOCATION:
Paving
Sample Location: 3' S of first island from E to
REPORT OF TESTS
AC
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
1 1 5.50 07/05/2000 7 105050
I 2 5.50 07/05/2000 7 101860
Average
1 3 5.50 07/26/2000 28 128910
1 4 5.50 07/26/2000 28 131730
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01SDS Page 1 of 4
a division ofl[en-~:~m
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
',ommerce Center
'.eltline (Bldg. A)
rexas
d field test and cast
BATCH TIME: 4:08am
:vin Farris
}NCRETE: 81 F
rNO: 611315
WEIGHT (pcf): N/A
l, w of NW comer of Bldg A, S wing.
CUMULATIVE YARDS: 30
2OMPRESSIVE
STRENGTH
(psi)
3710
3600
3660
456O
4660
4610
FRACTURE
TYPE
:ten approval of HBC Engineering, Inc.
CONCRETE COMPR $IVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
06/28/2000 Report No.:
85229000 Project No.:
Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
0016888
9499145,
Coppell
1221 S. i
Coppell,
Obtain samples of fresh concrete at the placement locations, perform requin
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5"
3-6%
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See placement location
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/28/2000
TIME SAMPLED: 6:00am BY: E
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 75 F CZ
TRUCK NO: 8 TICKE'
AIR CONTENT (%): 3.9 UNI
PLACEMENT LOCATION:
See page 1
Sample Location: 10 yards N of island at SE c,
REPORT OF TESTS
AC,
CYLINDER
MARKED
SET NO.
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) (lbs. force)
2 1 6.00 07/05/2000 7 101220
2 2 6.00 07/05/2000 7 104540
Average
2 3 6.00 07/26/2000 28 122040
2 4 6.00 07/26/2000 28 122400
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ
01SDS Page 2 of 4
a division of'l~n'msmn
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
ommerce Center
leltline (Bldg. A)
Texas
',d field test and cast
BATCH TIME: N/A
vin Farris
}NCRETE: 84
NO: 611324
WEIGHT (pcf): N/A
her of Building B, S wing, 3' E of W curb.
2UMULATIVE YARDS: 120
2OMPRESSIVE
STRENGTH
(psi)
3580
3700
3640
4320
4330
4330
FRACTURE
TYPE
en approval of HBC Engineering, Inc.
CONCRETE COMPREr $IVE STRENGTH
Date of Service:
Client No.:
Client:
Services:
06/28/2000 Report No.:
85229000 Project No.:
Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
ENGINEERING, INC.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
0016888 Report Date
07/27/2000
9499145~
Coppell IFommerce Center
1221 S. I~eltline (Bldg. A)
Coppell, [I'exas
Obtain samples of fresh concrete at the placement locations, perform requir~
compressive strength samples.
PROJECT DATA
CONTRACTOR: Butler Construction MIX I.D.: 9351
CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 06/28/2000
PLANT: 29 TIME SAMPLED: 7:25am BY: E
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 77 F Cl
SLUMP: 5" TRUCK NO: 37 TICKE'
AIR: 3-6% AIR CONTENT (%): 3.4 UNI
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
See page 1
ASTM C-172
ASTM C-39 Sample Location: Midway between island at
around transformer.
SAMPLE LOCATION: See placement location
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (iuches) TESTED (days) (lbs. force)
3 I 5.50 07/05/2000 7 102820
3 2 5.50 07/05/2000 7 110140
Average
Al
3 3 5.50 07/26/2000 28 119900
3 4 5.50 07/26/2000 28 119290
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril
01SDS Page 3 of 4
',d field test and cast
BATCH TIME: 6:48am
:vin Farris
)NCRETE: 87
rNO: 611339
r WEIGHT (pcf): N/A
corner of S wing of Bldg B and island
UMULATIVE YARDS: 220
:OMPRESSIVE
STRENGTH
(psi)
3640
3890
3770
4240
4220
4230
FRACTURE
TYPE
;eh approval of HBC Engineering, Inc.
CONCRETE COMPRE ,3IVE STRENGTH TES
Date of Service: 06/28/2000
Client No.: 85229000
Client:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Report No.:
Project No.:
Project:
0016888
9499145(
Coppell(
1221S.E
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir~
compressive strength samples.
EBEaNEERI~, II~.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/27/2000
ommerce Center
eltline (Bldg. A)
Fexas
I field test and cast
SLUMP:
AIR:
TEST METItOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5"
3-6%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See placement location
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
4 1 6.00
4 2 6.00
PROJECT DATA
MIX I.D.: 9351
PLACEMENT OATE: 06/28/2000
TIME SAMPLED: 9:00am BY: El
WEATHER CONDITIONS: Cloudy
TEMPERATURE (F) - AIR 79 F CC
TRUCK NO: 1852 TICKET
AIR CONTENT (%): 3.9 UNY
PLACEMENT LOCATION:
See page 1
Sample Location: 10' S of first island from W tr
REPORT OF TESTS
4 3 6.OO
4 4 6.00
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/05/2000 7 108830
07/05/2000 7 111960
Average
07/26/2000 28 124100
07/26/2000 28 122400
Average
BATCH TIME: 7:50am
~in Farris
NCRETE: 85 F
'NO: 644348
WEIGItT (pc0: N/A
E of Bldg B, SE comer of S wing.
:UMULATIVE YARDS: 310
:OMPRESSIVE
STRENGTH
(psi)
3850
3960
3910
439O
4330
4360
FRACTURE
TYPE
Technician: Ervin Farris
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures, Inc.
(I) Butler Construction
OISDS
Started: 3:00am Finished: ll:30am
(l) City of Coppell
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writl
Page 4 of 4
,ugene Harbour
Vice President
~.n approval of HBC Engineering, Inc.