Northlake 635(5)-LR000725CONCRETE COMPRF $1VE STRENGTH TES
89~1 Carpenter Fr~,, Suite #1O~
Date of Service: 06/23/2000
Client No.: 85229000
Report No.: 0016496
Project No.: 9499145
Client:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Project: Coppell
1221 S.
Coppelt
Services: Obtain samples of fresh concrete at the placement locations, perform requiv
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
4-6"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
MLX L~.: 9351
PLACEMENT DATi~,: 06/23/2000
TIME SAMPLED: 6:40am ~v: F
WKnTH~R CoNorr~oNs: Cloudy
TEMPEaATURE(V)-AIa 75 F C
TRUCK NO: 114 T~CK~
AIR coto~z~rr (~): N/A VN
pLACEMENT LOCATION:
Paving area of 250' x 12ff in front of NE side
SAMPLE LOCATION: 100' E of NE comer of bldg. A
REPORT OF TESTS
A(
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
I 1 6.00 06/30/2000
I 2 6.00 06130/2000
1 3 6.00 0712112000
I 4 6.00 07/2112000
This report is exclusively for the us~ of the client indicated ahoy
AGE
(day~)
7
7
MAXIMUM
LOAD
(ll~ force)
77370
79330
Average
28 98280
28 92160
Average
DOES NOT COMPLY
This report contains:
item(s) which D_Q NOT
comply with projec'~
plans/specifications.
0ILL
Report Date
07/25/2000
kmamerce Center
~eltline (Bldg. A)
Texas
field test and cast
BATCH TIME: 6:00am
tic Garcia
:~NC~TE: 89 F
NO: 566879
WEIGHT (p~f): N/A
~f Bldg., A
:C~TIVE YARI)S: 70
COMI~RESSIVE
STRENGTH
2740
2810
2780
3480
3260
3370
gn apl~°val of HBC Engineering, Inc.
Client No.: 85229000
Da/las TX 75251
8~50
CONT~CTOm Butler Construction
CONCn~'~St~: PioOeer
ri. ANT: 22
St~TtON
S~t~m: 4~ p~ ~ 28 ~ys
~: ~6~
A~ N/A
~~ AS~ C~143
A~C-I~
~ C-39
40' E of NE corn~ of ~d,~g.
2 I 7~00
2 2 TOO 06/30/211410'
2 3 7:00 07/21/2000
2 4 7,o0
N/A-
CONCRETE COMPREr oSIVE STRENGTH TES
Date of Service: 06/23/2000
Client No.: 85229000
Report No.: 0016496
Project No.: 9499145~
Client: Transwestern Property Company Project:
Attn: James Gaspard
12221 Merit Drive,//450
Dallas TX 75251
Coppell
1221 S. ]
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform requir{
compressive strength samples.
SLUMP:
AIR:
TEST METIIOD:
CONTILACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTII: 4000 psi @ 28 Days
4-6"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/23/2000
TIME SAMPLED: 9:45am BY: E
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCK NO: 756
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Cloudy
80 F o
TICKE
UNI
SAMPLE LOCATION: 100' S, 90' E of NE corner of bldg.
REPORT OF TESTS
AC
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
3 1 6.50 06/30/2000 7 85720
3 2 6.50 06/30/2000 7 86030
Average
3 3 6.50 07/21/2000 28 114950
3 4 6.50 07/21/2000 28 116470
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wri
01LL
a division of'ffa~mc~n
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/25/2000
',ommerce Center
~eltline (Bldg. A)
'eTas
I field test and cast
BATCH TIME: 8:42am
:ic Garcia
~NCRETE: 90 F
NO: 566909
'WEIGHT (pcf): N/A
CUMULATIVE YARDS: 280
COMPRESSIVE
STRENGTH
(psi)
3030
3040
3040
4070
4120
4100
.ten approval of HBC Engineering, Inc.
CONCRETE COMPREhenSIVE STRENGTH TES.
Date of Service: 06/23/2000
CiientNo.: 85229000
Client:
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Report No.: 0016496
Project No.: 94991451
Project: Coppell
1221 S.
Coppell,
Services: Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
SLUMP:
AIR:
TEST METItOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
4-6"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/23/2000
TIME SAMPLED: ll:10am BY: El
WEATHER CONDITIONS:
TEMPERATURE (F)- AIR
TRUCK NO: 1824
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page I
Cloudy
83 v
TICKE~
UNr
SAMPLE LOCATION: 175' S, 30' E of NE corner of bldg.
REPORT OF TESTS
AC1
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inch,) TESTED (days) (lbs.~rce)
4 1 5.00 06/30/2000 7 89290
4 2 5.00 06/30/2000 7 86700
Average
4 3 5.00 07/21/2000 28 113530
4 4 5.00 07/21/2000 28 117030
Average
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writt
0ILL
ENGINEERIIx~, INC.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/25/2000
',ommerce Center
;eltline (Bldg. A)
Fexas
d field test and cast
BATCH TIME: 9:55am
ic Garcia
,NCRETE: 90 F
NO: 566920
' WEIGHT (pcf): N/A
:UMULATIVE YARDS: 370
~,OMPRESSIVE
STRENGTH
(psi)
3160
3070
3120
4010
4140
4080
FRACTURE
TYPE
~n approval of HBC Engineering, Inc.
'CONCRETE
COMPR.r"3SIVE STRENGTH
Date of Service: 06/23/2000
Client No.: 85229000
Client:
SLUMP:
AIR:
TEST METHOD:
Services:
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Report No.: 001649~
Project No.: 949914:
Project:
Coppell
1221 S.
Coppell
Obtain samples of fresh concrete at the placement locations, perform requir
compressive strength samples.
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANfr: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
4-6"
N/A
ASTM C-143
ASTM C-172
ASTM C-39
See below
SAMPLE LOCATION:
PROJECT DATA
MIX I.D.: 9351
PLACEMENT DATE: 06/23/2000
TIME SAMPLED: 12:55pm BY: E
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCI~ NO: 1883
AIR CONTENT (%): N/A
PLACEMENT LOCATION:
See page 1
REPORT OF TESTS
CYLINDER MEASURED MAXIMUM
MARKED SLLrMp DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
5 I 6.00 06/30/2000 7 86750
5 2 6.00 06/30/2000 7 89910
Average
5 3 6.00 07/21/2000 28 116470
5 4 6.00 07/21/2000 28 116420
Average
Sample location: 240' S, 90' E of NE corner of bldg. A
ENGINEERI~, INC.
a division of l[art-~.nn
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/25/2000
Commerce Center
Beltline (Bldg. A)
Texas
ed field test and cast
BATCH TIME: 12:00pm
ric Garcia
Cloudy
87 F O
TICKE
UN!
ACi
Technician: Eric Garcia Started: 5:00am Finished: 2:45pm ~
Report Distribution:
(1) Transwestem Property Company (I) City of Coppell
(1) O'Brien & Associates (l) City of Coppell El
(1) Technistructures, Inc.
(1) Butler Construction
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writte~
0ILL
)NCRETE: 90 F
NO: 566934
'WEIGHT (pcf): N/A
~'UMULATIVE YARDS: 480
',OMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
3070
3180
3130
4120
4120
4120
Engin~~Lnc,-
lgene Harbour
Vice President
approval of HBC Engineering, Inc.
CONCRETE COMPRE $IVE STRENGTH TES?
Date of Service: 07/11/2000 Report No.: 0017997
Client No.: 85229000 Project No.: 94991451
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, #450
Dallas TX 75251
Services:
Coppell
1221 S.
Coppell,
Obtain samples of fresh concrete at the placement locations, perform require
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
SAMPLE LOCATION:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
20' w of SE corner of building
PROJECT DATA
MIX I.D.: 9349
PLACEMENT DATE: 07/11/2000
TIME SAMPLED: 10:20am BY: T~
WEATHER CONDITIONS: WarlTl, p:
TEMPERATURE (F) - AIR 80 F C(
TRUCK NO: 1888 TICKE'
AIR CONTENT (%): N/A UNI
PLACEMENT LOCATION:
S side of building leaveouts on building A
REPORT OF TESTS
AC
CYLINDER
MARKED
SET NO.
MEASURED
SLUMP
(inches)
1 1 6.00
I 2 6.00
I 3 6.00
1 4 6.00
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
07/18/2000 7 108000
07/18/2000 7 117880
Average
08/08/2000 28
08/08/2000 28
Technician: Terry L. Smith
Report Distribution:
(I) Transwestern Property Company
(I) O'Brien & Associates
(I) Technistructures, Inc.
(1) Butler Construction
Started: 8:30am Finished: 2:30pm [--L~
(1) City of Coppell
(1) City of Coppell
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the
0ILL Page 1 of 1
ENG--,INC.
a division ofl~rrm:on
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
07/25/2000
'.ommerce Center
;eltline (Bldg. A)
Fexas
d field test and cast
BATCH TIME: l:15pm
:try L. Smith
xtly cloudy
INCRETE: 89 F
NO: 509970
WEIGHT (pcf): N/A
UMULATIVE YARDS: 30
;OMPRESSIVE
STRENGTH
(psi)
3820
4170
4000
FRACTURE
TYPE
Vice President
ten approval of HBC Engineering, Inc.